7new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.5%like-for-like prices in Roughmoor, 2024 → 2025 (council +2.7%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 60 m²
12since energy certificates began (2008)
0in SN5 5UZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
288hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
37 planned, approved or being built and 21 running (232 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Rivermead Drive, Rivermead Industrial Estate - Solar PanelsApproved, not yet built · 230 kW
Nov 2022
1.1 km away - Battery storage
Brindley Close (Extension)Being built · 6 MW
May 2022
1.7 km away - Rooftop solar
Sainsburys, Paddington Drive - Solar PanelsApproved, not yet built · 380 kW
Feb 2024
2.5 km away - Rooftop solar
Unit O, Penzance Drive - Solar PanelsApproved, not yet built · 2 MW
May 2024
2.7 km away - Rooftop solar
Frankland Road, Blagrove - Solar PanelsApproved, not yet built
Jul 2025
3.1 km away - Rooftop solar
Newcome Drive - Solar PanelsApproved, not yet built
Jun 2022
3.2 km away - Rooftop solar
Orbital Shopping Park, North Swindon District Centre - Solar panelsApproved, not yet built · 2 MW
Mar 2024
3.5 km away - Solar farm
Bentham House Farm, Mopes Lane - Solar FarmApproved, not yet built · 12 MW
Jun 2025
3.7 km away - Solar farm
Mopes Lane, Purton - Solar FarmApproved, not yet built · 20 MW
Apr 2023
3.7 km away - Solar farm
Studley Grange Farm, Studley - Solar FarmPlanning application in · 2 MW
Apr 2026
3.8 km away - Battery storage
Road and street works within 1 km
2 permitted works running now or planned.
- Minor
Old Shaw Lane, SwindonUtility asset works · THAMES WATER · Some carriageway incursion
Jan 2027 to Jan 2027
500 m away - Minor
Tamworth Drive, SwindonUtility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
West Oxfordshire Energy ParkGenerating Stations · Located on land south-west of Carterton and to the west of Lechlade, within the administrative areas of West Oxfordshire District Council and Oxfordshire County Council. application due May 2027
18.8 km away - Examinationapplication due September 2025
21.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Barnfield Solar Park (solar farm, 1.8 km); Swindon Sewerage Treatment Works (anaerobic digestion, 2.2 km); Mannington Battery Storage Plant (battery storage, 2.7 km); Wickfield Farm (solar farm, 4.1 km); Spittleborough Farm (solar farm, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.