Country England and Wales › Region South West › Council Wiltshire › Neighbourhood Devizes East › Postcode SN10 3UB What's changing near SN10 3UB Within 2 km, around Devizes East in Wiltshire. Building, planning, schools, transport, prices and crime.
65 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.7% like-for-like prices in Devizes East, 2024 → 2025 (council +2.1%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed houses · Dec 2025 – Sep 2026
Sept 2026 150 m away New homes 13 new homes completed 2 flats, 11 houses · Apr 2026 – Sep 2026
Sept 2026 2.0 km away New homes 18 new homes completed houses · Jun 2025 – Jun 2026
Jun 2026 200 m away New homes 6 new homes completed flats · Jun 2026
Jun 2026 1.8 km away New homes 9 new homes completed houses · Dec 2025 – Apr 2026
Apr 2026 1.9 km away New homes 6 new homes completed houses · Nov 2025
Nov 2025 200 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
2 homes extended 2021–2025, typically adding 58 m²
10 since energy certificates began (2008)
1 in SN10 3UB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
8 hours of spills in 2025 between them (typical neighbourhood: about 36)
10 spill events counted
Wessex Water Roundway Hospital Cso into Summerham Brook (S) 6 spills, 5 hours in 2025
950 m away Wessex Water Valley Sewer Cso into Poulshot Stream 4 spills, 2 hours in 2025
2.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 4 planned, approved or being built and 6 running (76 MW between them). Those within 5 km are on the map above.
Solar farm Potterne Park Farm, Potterne - Solar Farm Approved, not yet built · 50 MW
Apr 2026 3.7 km away Solar farm Byde Mill Solar Farm, Poulshot - Solar Farm Approved, not yet built · 14 MW
Dec 2025 5.4 km away Solar farm HM Erlestoke Solar Array Planning application in · 210 kW
Dec 2020 7.8 km away Solar farm Sloperton Farm, Westbrook - Solar Panels Approved, not yet built · 340 kW
Jun 2025 7.9 km away Running nearest: Hopton Road Industrial Estate (solar farm, 3.4 km); Lower End Farm (solar farm, 5.8 km); Bromham House Farm (anaerobic digestion, 6.9 km); Stokes Marsh Farm (solar farm, 8.3 km); CRAYSMARSH SOLAR FARM (solar farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 2 permitted works running now or planned.
Standard Nursteed Road, Devizes Highway improvement works · WILTSHIRE COUNCIL · Two-way signals
Nov 2026 to Nov 2026 300 m away Minor Pans Lane, Devizes Remedial works · WALES AND WEST UTILITIES LTD · Give and take
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided A303 Stonehenge Highways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023 20.6 km away Examination application due September 2025 26.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.