What's changing near SN10 2GB
Within 2 km, around Devizes East in Wiltshire. Building, planning, schools, transport, prices and crime.
28new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.7%like-for-like prices in Devizes East, 2024 → 2025 (council +2.1%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Oct 2026
Oct 2026
1.1 km away - New homes
13 new homes completed2 flats, 11 houses · Apr 2026 – Sep 2026
Sept 2026
1.1 km away - New homes
9 new homes completedhouses · Dec 2025 – Apr 2026
Apr 2026
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 46 m²
11since energy certificates began (2008)
0in SN10 2GB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
1,078hours of spills in 2025 between them (typical neighbourhood: about 36)
52spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
7 planned, approved or being built and 8 running (74 MW between them). Those within 5 km are on the map above.
- Solar farm
Potterne Park Farm, Potterne - Solar FarmApproved, not yet built · 50 MW
Apr 2026
6.1 km away - Solar farm
Byde Mill Solar Farm, Poulshot - Solar FarmApproved, not yet built · 14 MW
Dec 2025
6.9 km away - Solar farm
Sloperton Farm, Westbrook - Solar PanelsApproved, not yet built · 340 kW
Jun 2025
7.0 km away - Solar farm
Sands Farm Quarry, Low Lane - Solar PanelsPlanning application in · 6 MW
Feb 2024
8.8 km away - Battery storage
Sands Farm Quarry, Low Lane - Battery StoragePlanning application in · 4 MW
Feb 2024
8.8 km away - Rooftop solar
St Marys School, Curzon Street - Solar panelsApproved, not yet built · 230 kW
Jul 2024
9.1 km away - Rooftop solar
Hangar 45, Yatesbury - Extensions & Solar PanelsPlanning application in · 360 kW
Feb 2026
9.4 km away
Running nearest: Hopton Road Industrial Estate (solar farm, 950 m); Bromham House Farm (anaerobic digestion, 5.8 km); Lower End Farm (solar farm, 7.9 km); Compton Bassett Landfill (landfill gas, 8.4 km); Snarlton Farm (Melksham solar farm) (solar farm, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
5 permitted works running now or planned, 1 of them major.
- Major, planned
Hopton Road, DevizesNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Two-way signals
Nov 2026 to Nov 2026
550 m away - Standard
Hopton Road, DevizesUtility asset works · WESSEX WATER · Give and take
Nov 2026 to Nov 2026
450 m away - Standard
Windsor Drive, DevizesUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Multi-way signals
Oct 2026 to Oct 2026
550 m away - Standard
Hopton Road, DevizesUtility asset works · WESSEX WATER · Give and take
Nov 2026 to Nov 2026
650 m away - Minor
London Road, DevizesUtility repair and maintenance works · WESSEX WATER · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023
22.5 km away - Examinationapplication due September 2025
24.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.