Country England and Wales › Region South West › Council Wiltshire › Neighbourhood Devizes East › Postcode SN10 2FB What's changing near SN10 2FB Within 2 km, around Devizes East in Wiltshire. Building, planning, schools, transport, prices and crime.
35 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.7% like-for-like prices in Devizes East, 2024 → 2025 (council +2.1%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 13 new homes completed 2 flats, 11 houses · Apr 2026 – Sep 2026
Sept 2026 750 m away New homes 6 new homes completed flats · Jun 2026
Jun 2026 1.8 km away New homes 9 new homes completed houses · Dec 2025 – Apr 2026
Apr 2026 900 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
4 homes extended 2021–2025, typically adding 46 m²
10 since energy certificates began (2008)
0 in SN10 2FB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 8 planned, approved or being built and 9 running (91 MW between them). Those within 5 km are on the map above.
Solar farm Potterne Park Farm, Potterne - Solar Farm Approved, not yet built · 50 MW
Apr 2026 6.1 km away Solar farm Byde Mill Solar Farm, Poulshot - Solar Farm Approved, not yet built · 14 MW
Dec 2025 6.6 km away Solar farm Sloperton Farm, Westbrook - Solar Panels Approved, not yet built · 340 kW
Jun 2025 6.7 km away Solar farm Sands Farm Quarry, Low Lane - Solar Panels Planning application in · 6 MW
Feb 2024 8.7 km away Battery storage Sands Farm Quarry, Low Lane - Battery Storage Planning application in · 4 MW
Feb 2024 8.7 km away Rooftop solar St Marys School, Curzon Street - Solar panels Approved, not yet built · 230 kW
Jul 2024 9.0 km away Rooftop solar Hangar 45, Yatesbury - Extensions & Solar Panels Planning application in · 360 kW
Feb 2026 9.5 km away Solar farm HM Erlestoke Solar Array Planning application in · 210 kW
Dec 2020 10.0 km away Running nearest: Hopton Road Industrial Estate (solar farm, 1.1 km); Bromham House Farm (anaerobic digestion, 5.5 km); Lower End Farm (solar farm, 7.7 km); Snarlton Farm (Melksham solar farm) (solar farm, 8.2 km); Compton Bassett Landfill (landfill gas, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 5 permitted works running now or planned, 1 of them major.
Major, planned Hopton Road, Devizes New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Two-way signals
Nov 2026 to Nov 2026 500 m away Standard Windsor Drive, Devizes Utility repair and maintenance works · WALES AND WEST UTILITIES LTD · Multi-way signals
Oct 2026 to Oct 2026 350 m away Standard Hopton Road, Devizes Utility asset works · WESSEX WATER · Give and take
Nov 2026 to Nov 2026 450 m away Standard Hopton Road, Devizes Utility asset works · WESSEX WATER · Give and take
Nov 2026 to Nov 2026 750 m away Minor London Road, Devizes Utility repair and maintenance works · WESSEX WATER · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided A303 Stonehenge Highways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023 22.6 km away Examination application due September 2025 24.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.