Country England and Wales › Region South East › Council Reigate and Banstead › Neighbourhood Chipstead & Netherne › Postcode SM7 3PX What's changing near SM7 3PX Within 2 km, around Chipstead & Netherne in Reigate and Banstead. Building, planning, schools, transport, prices and crime.
94 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-2.4% like-for-like prices in Chipstead & Netherne, 2024 → 2025 (council +1.1%)
-6% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 22 new homes completed flats · Jun 2026
Jun 2026 1.5 km away New homes 11 new homes completed flats · Jun 2026
Jun 2026 1.5 km away New homes 18 new homes completed flats · Jun 2026
Jun 2026 1.5 km away New homes 7 new homes completed houses · Apr 2026
May 2026 350 m away New homes 8 new homes completed houses · Sep 2025 – Jan 2026
Jan 2026 1.6 km away New homes 10 new homes completed flats · Jul 2025
Jul 2025 600 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
14 homes extended 2021–2025, typically adding 45 m²
24 since energy certificates began (2008)
2 in SM7 3PX itself
Extended certificate 2024 Extended certificate 2015 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 3 running (31 MW between them). Those within 5 km are on the map above.
Rooftop solar Legal And General Kingswood House, St Monicas Road - Solar Panels Approved, not yet built
May 2023 3.3 km away Rooftop solar Richard Doll Building, Cotswold Road - Solar panels Approved, not yet built · 460 kW
Jan 2024 3.8 km away Rooftop solar Toyota Limited, Yew Tree Bottom Road - Solar Panels Approved, not yet built · 250 kW
May 2026 4.4 km away Battery storage Rushett Lane - Battery Storage System Approved, not yet built · 30 MW
Apr 2025 5.1 km away Rooftop solar Westcroft Leisure Centre, Westcroft Road - Solar Panels Approved, not yet built · 270 kW
Oct 2024 5.8 km away Rooftop solar David Lloyd Leisure Centre, Ewell Road - Solar PV Panels Approved, not yet built · 330 kW
Nov 2023 5.9 km away Rooftop solar The Royal Alexandra And Albert School, Gatton Park - Solar PV Panels Approved, not yet built · 340 kW
May 2023 6.1 km away Battery storage Merstham Community Hub, Merstham - Energy Storage Facility Planning application in · 200 kW
Jul 2024 6.4 km away Rooftop solar Whitgift School, Nottingham Road - Solar Panels Planning application in · 390 kW
Aug 2022 6.8 km away Rooftop solar University For The Creative Arts, Ashley Road - Solar PV Panels Approved, not yet built
Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 18.1 km away Decided decided May 2022 19.6 km away Pre-application application due March 2027 20.0 km away Decided decided Sept 2014 21.9 km away Pre-application application due March 2028 22.2 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 24.1 km away Pre-application Transport schemes within 20 km Transport Northern line extension: Battersea Power Station New Underground station, opened September 2021
Sept 2021 18.2 km away Transport Northern line extension: Nine Elms New Underground station, opened September 2021
Sept 2021 18.5 km away Running nearest: Beddington EfW (energy from waste, 7.3 km); Patteson Court Landfill Site (landfill gas, 8.2 km); Redhill 2 (landfill gas, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.