Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
St Anthonys Hospital, London Road - Solar PanelsApproved, not yet built · 240 kW
Jun 2024 6.8 km away
Rooftop solar
The Royal Alexandra And Albert School, Gatton Park - Solar PV PanelsApproved, not yet built · 340 kW
May 2023 6.9 km away
Running nearest: Beddington EfW (energy from waste, 6.8 km); Patteson Court Landfill Site (landfill gas, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Airports · To the north-west of the existing Heathrow Airport
application due December 2027 25.0 km away
Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport
application due November 2027 27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.