What's changing near SM4 4NN
Within 2 km, around Lower Morden in Merton. Building, planning, schools, transport, prices and crime.
416new homes completed within 2 km, last 2 years
563homes given permission on brownfield sites since 2021
-0.9%like-for-like prices in Lower Morden, 2024 → 2025 (council +2.1%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
78 new homes completed77 flats, 1 houses · Apr 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
30 new homes completedhouses · Apr 2025 – Jul 2026
Jul 2026
1.7 km away - New homes
95 new homes completedflats · Apr 2026
May 2026
1.9 km away - New homes
45 new homes completedflats · Apr 2026
Apr 2026
1.9 km away - New homes
40 new homes completedflats · Apr 2026
Apr 2026
1.9 km away - New homes
5 new homes completedflats · Apr 2026
Apr 2026
2.0 km away - New homes
10 new homes completedflats · Mar 2026
Mar 2026
1.7 km away - New homes
10 new homes completedflats · Mar 2026
Mar 2026
1.7 km away - New homes
6 new homes completedflats · Mar 2026
Mar 2026
850 m away - New homes
10 new homes completedflats · Dec 2025 – Jan 2026
Jan 2026
1.7 km away - New homes
10 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
10 new homes completedhouses · Nov 2025
Dec 2025
1.7 km away - New homes
Planning applications within 500 m
12applications in the last 12 months
9approved · 2 refused
1still being decided
11net new homes in approved schemes since 2023
- Approved
4, ALLGOOD CLOSE, SM4 4PAAPPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED ERECTION OF A HIP TO GABLE, REAR DORMER ROOF EXTENSION AND 3 FRONT ROOFLIGHTSMerton 26/LDCP/1892 · Householder
Sept 2026
400 m away - Approved
11, CARLINGFORD ROAD, SM4 4NYDEMOLITION OF EXISTING CONSERVATORY AND ERECTION OF A SINGLE STOREY REAR EXTENSIONMerton 26/HOUSE/1480 · Householder
Jul 2026
450 m away - Approved
59, CARLINGFORD ROAD, SM4 4NYAPPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED ERECTION OF A HIP TO GABLE, REAR DORMER ROOF EXTENSION.Merton 26/LDCP/1089 · Householder
May 2026
300 m away - Approved
161, Aragon Road, SM4 4QG161 ARAGON ROADMerton 26/LDCP/0593 · All Other
Mar 2026
500 m away - Approved
1a, 1a Haydon Court, Garth Road, SM4 4LS1A HAYDON COURT, GARTH ROAD, MORDEN, SURREY SM4 4LSMerton 26/LDCE/0512 · All Other
Mar 2026
400 m away - Application Received
307, Lynmouth Avenue, SM4 4RXAPPLICATION FOR PRIOR APPROVAL IN RESPECT OF THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION WITH A DEPTH OF 6M, MAXIMUM HEIGHT OF 4M AND EAVES HEIGHT OF 3M.Merton 26/P0081 · Prior Approval
Jan 2026
150 m away - Approved
267, Garth Road, SM4 4NFErection of a loft dormer conversion with skylights to the front slope.Merton 25/P3794 · Householder
Dec 2025
100 m away
33homes extended 2021–2025, typically adding 23 m²
45since energy certificates began (2008)
3in SM4 4NN itself
- Extendedcertificate 2024
- Extendedcertificate 2023
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
28 planned, approved or being built and 2 running (32 MW between them). Those within 5 km are on the map above.
- Rooftop solar
St Anthonys Hospital, London Road - Solar PanelsApproved, not yet built · 240 kW
Jun 2024
800 m away - Rooftop solar
Kimpton Park Way - Solar Pv PanelsPlanning application in · 180 kW
Aug 2023
1.8 km away - Rooftop solar
Wyvern Estate, Beverley Way - Solar PanelsApproved, not yet built · 170 kW
Oct 2022
2.1 km away - Rooftop solar
David Lloyd Club, Bushey Road - Solar PanelsApproved, not yet built · 800 kW
Sept 2023
2.4 km away - Rooftop solar
David Lloyd Leisure Centre, Ewell Road - Solar PV PanelsApproved, not yet built · 330 kW
Nov 2023
3.5 km away - Rooftop solar
Morden Road, South Wimbledon - Solar pv panelsApproved, not yet built · 150 kW
Aug 2024
3.5 km away - Rooftop solar
JJ Foodservice, South Wimbledon - Solar PanelsPlanning application in · 350 kW
Sept 2024
4.1 km away - Biomass
Hook Rise South Energy CentreApproved, not yet built
Feb 2022
4.1 km away - Rooftop solar
Sainsburys Superstore, Merton High Street - Solar PanelsApproved, not yet built · 990 kW
Sept 2024
4.4 km away - Rooftop solar
Hook Rise Business Centre, Hook Rise South - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
4.9 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2027
11.4 km away - Decideddecided Sept 2014
15.7 km away - Decideddecided May 2022
17.2 km away - Pre-applicationapplication due December 2027
18.5 km away - Pre-applicationapplication due March 2028
19.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
20.6 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
11.8 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
12.4 km away - TransportMay 2022
14.7 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
15.6 km away
Running nearest: Beddington EfW (energy from waste, 5.5 km); London’s Queen Elizabeth II reservoir (solar farm, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.