384 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.8% like-for-like prices in Maidenhead East, 2024 → 2025 (council +1.8%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 50 new homes completed flats · Sep 2026
Sept 2026 1.8 km away New homes 26 new homes completed flats · Sep 2026
Sept 2026 1.8 km away New homes 33 new homes completed flats · Sep 2026
Sept 2026 1.8 km away New homes 41 new homes completed flats · Sep 2026
Sept 2026 1.8 km away New homes 6 new homes completed flats · Nov 2025 – Sep 2026
Sept 2026 1.8 km away New homes 10 new homes completed 9 flats, 1 houses · Apr 2026 – Jul 2026
Jul 2026 1.6 km away New homes 5 new homes completed flats · Oct 2025 – Mar 2026
Mar 2026 1.8 km away New homes 21 new homes completed flats · Oct 2025
Nov 2025 1.7 km away New homes 33 new homes completed flats · Nov 2025
Nov 2025 1.7 km away New homes 44 new homes completed flats · Oct 2025
Nov 2025 1.7 km away New homes 52 new homes completed flats · Oct 2024 – Nov 2025
Nov 2025 1.8 km away New homes 51 new homes completed flats · Nov 2025
Nov 2025 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 57 m²
21 since energy certificates began (2008)
2 in SL6 8HE itself
Extended certificate 2025 Extended certificate 2020 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 8 running (103 MW between them). Those within 5 km are on the map above.
Rooftop solar Furze Platt Senior School, Furze Platt Road - Solar Panels Approved, not yet built · 250 kW
May 2023 2.5 km away Rooftop solar Lynch Hill School Primary Academy, Garrard Road - Solar Panels Approved, not yet built · 260 kW
Aug 2024 4.5 km away Rooftop solar Thomas Road, Wooburn Industrial Estate - Solar Panels Approved, not yet built · 420 kW
Nov 2023 5.0 km away Energy from waste Slough Heat & Power Station Being built · 50 MW
May 2021 5.5 km away Rooftop solar Globe Business Park, Fieldhouse Lane - PV Panels Approved, not yet built
Jan 2023 5.7 km away Rooftop solar Unit 2a, Slough Retail Park - Solar Panels Approved, not yet built · 190 kW
Feb 2022 6.2 km away Rooftop solar Twinches Lane - Solar photovoltaic Approved, not yet built · 320 kW
Aug 2021 6.3 km away Rooftop solar David Lloyd Leisure Group - Solar PV System Approved, not yet built
Aug 2023 6.6 km away Solar farm Salters Lane - Solar Panels Planning application in
Jul 2025 6.6 km away Battery storage Salters Lane - Solar Panels Planning application in
Jul 2025 6.6 km away Solar farm Road and street works within 1 km 14 permitted works running now or planned.
Standard Lock Mead, Maidenhead Utility repair and maintenance works · SOUTH EAST WATER · Some carriageway incursion
Jan 2027 to Jan 2027 100 m away Minor Poplars Grove, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 100 m away Minor Lock Mead, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Give and take
Oct 2026 to Oct 2026 150 m away Minor Poplars Grove, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 150 m away Minor Amberley Court, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away Minor Court Road, Maidenhead Highway repair and maintenance works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · No carriageway incursion
Nov 2026 to Nov 2026 400 m away Minor Ashdown, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Give and take
Oct 2026 to Oct 2026 550 m away Minor Battlemead Close, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Give and take
Oct 2026 to Oct 2026 550 m away Minor Lower Cookham Road, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 600 m away Major infrastructure projects within 30 km Decided decided Nov 2023 5.5 km away Decided decided Sept 2016 6.6 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 9.3 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 16.8 km away Pre-application application due December 2027 18.8 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Iomart, Clivemont Road - Solar Panels (rooftop solar, 1.8 km); Fibrepower, Slough (energy from waste, 5.4 km); Slough Sewage Treatment Works (other, 5.7 km); Derehams Farm, Derehams Lane - Battery Storage (battery storage, 8.2 km); Wapsey's Wood (landfill gas, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.