Country England and Wales › Region South East › Council Windsor and Maidenhead › Neighbourhood Maidenhead East › Postcode SL6 8DL What's changing near SL6 8DL Within 2 km, around Maidenhead East in Windsor and Maidenhead. Building, planning, schools, transport, prices and crime.
468 new homes completed within 2 km, last 2 years
539 homes given permission on brownfield sites since 2021
+3.8% like-for-like prices in Maidenhead East, 2024 → 2025 (council +1.8%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 14 new homes completed flats · Dec 2025 – Oct 2026
Oct 2026 950 m away New homes 9 new homes completed houses · Oct 2026
Oct 2026 900 m away New homes 50 new homes completed flats · Sep 2026
Sept 2026 1.0 km away New homes 26 new homes completed flats · Sep 2026
Sept 2026 1000 m away New homes 33 new homes completed flats · Sep 2026
Sept 2026 1000 m away New homes 41 new homes completed flats · Sep 2026
Sept 2026 1.0 km away New homes 6 new homes completed flats · Nov 2025 – Sep 2026
Sept 2026 1000 m away New homes 10 new homes completed 9 flats, 1 houses · Apr 2026 – Jul 2026
Jul 2026 650 m away New homes 31 new homes completed flats · May 2026
May 2026 1.9 km away New homes 5 new homes completed flats · Oct 2025 – Mar 2026
Mar 2026 900 m away New homes 21 new homes completed flats · Oct 2025
Nov 2025 900 m away New homes 33 new homes completed flats · Nov 2025
Nov 2025 950 m away New homes 23 homes extended 2021–2025, typically adding 29 m²
41 since energy certificates began (2008)
0 in SL6 8DL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 21 planned, approved or being built and 4 running (91 MW between them). Those within 5 km are on the map above.
Rooftop solar Furze Platt Senior School, Furze Platt Road - Solar Panels Approved, not yet built · 250 kW
May 2023 2.5 km away Rooftop solar Lynch Hill School Primary Academy, Garrard Road - Solar Panels Approved, not yet built · 260 kW
Aug 2024 4.7 km away Energy from waste Slough Heat & Power Station Being built · 50 MW
May 2021 5.5 km away Rooftop solar Unit 2a, Slough Retail Park - Solar Panels Approved, not yet built · 190 kW
Feb 2022 5.9 km away Rooftop solar Twinches Lane - Solar photovoltaic Approved, not yet built · 320 kW
Aug 2021 6.1 km away Rooftop solar Thomas Road, Wooburn Industrial Estate - Solar Panels Approved, not yet built · 420 kW
Nov 2023 6.1 km away Rooftop solar Globe Business Park, Fieldhouse Lane - PV Panels Approved, not yet built
Jan 2023 6.4 km away Rooftop solar Berkshire College Of Agriculture, Burchetts Green Road - Solar Panels Planning application in
May 2026 6.5 km away Solar farm Horizon, Hurley - Solar Panels Planning application in · 1 MW
Aug 2022 7.5 km away Solar farm Salters Lane - Solar Panels Planning application in
Jul 2025 7.7 km away Battery storage Road and street works within 1 km 14 permitted works running now or planned.
Minor Camperdown, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · No carriageway incursion
Oct 2026 to Oct 2026 250 m away Minor Frances Avenue, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Minor Boulters Court, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away Minor Bridge Road, Maidenhead Statutory Infrastructure Works · EUNETWORKS · No carriageway incursion
Oct 2026 to Oct 2026 500 m away Minor Boulters Court, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away Minor Horton Close, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away Minor Bath Road, Taplow Statutory Infrastructure Works · EUNETWORKS · No carriageway incursion
Oct 2026 to Oct 2026 600 m away Minor The Farthingales, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Stop/go boards
Nov 2026 to Nov 2026 650 m away Minor Lower Cookham Road, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away Major infrastructure projects within 30 km Decided decided Nov 2023 5.4 km away Decided decided Sept 2016 5.6 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 10.1 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 16.6 km away Pre-application application due December 2027 18.5 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Iomart, Clivemont Road - Solar Panels (rooftop solar, 1.4 km); Slough Sewage Treatment Works (other, 5.3 km); Fibrepower, Slough (energy from waste, 5.4 km); Derehams Farm, Derehams Lane - Battery Storage (battery storage, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.