Country England and Wales › Region South East › Council Windsor and Maidenhead › Neighbourhood Bray Wick & Holyport › Postcode SL6 2FW What's changing near SL6 2FW Within 2 km, around Bray Wick & Holyport in Windsor and Maidenhead. Building, planning, schools, transport, prices and crime.
188 new homes completed within 2 km, last 2 years
58 homes given permission on brownfield sites since 2021
-3.4% like-for-like prices in Bray Wick & Holyport, 2024 → 2025 (council +1.8%)
-13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed houses · Aug 2026 – Oct 2026
Oct 2026 150 m away New homes 15 new homes completed houses · Jul 2026 – Oct 2026
Oct 2026 1.4 km away New homes 35 new homes completed 19 flats, 16 houses · Mar 2026 – Sep 2026
Sept 2026 950 m away New homes 35 new homes completed 1 flats, 34 houses · Mar 2025 – Jul 2026
Jul 2026 1.2 km away New homes 44 new homes completed 20 flats, 24 houses · Jul 2025 – Jun 2026
Jun 2026 1.3 km away New homes 20 new homes completed 15 flats, 5 houses · Aug 2025 – Apr 2026
Apr 2026 900 m away New homes 28 new homes completed 18 flats, 10 houses · Apr 2025 – Nov 2025
Nov 2025 950 m away Planning permission Jun 2024 1.9 km away Planning permission Permission for 3 homes Statesman House Stafferton Way And Braywick Gate, Braywick Road, Maidenhead (outline planning permission) Mar 2024 1.8 km away Planning permission Aug 2022 1.2 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 45 m²
15 since energy certificates began (2008)
4 in SL6 2FW itself
Extended certificate 2022 Extended certificate 2022 Extended certificate 2022 Extended certificate 2010 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 3 running (51 MW between them). Those within 5 km are on the map above.
Rooftop solar Furze Platt Senior School, Furze Platt Road - Solar Panels Approved, not yet built · 250 kW
May 2023 4.2 km away Rooftop solar Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic Approved, not yet built · 1 MW
Jun 2024 5.6 km away Rooftop solar Lynch Hill School Primary Academy, Garrard Road - Solar Panels Approved, not yet built · 260 kW
Aug 2024 6.1 km away Rooftop solar Unit 2a, Slough Retail Park - Solar Panels Approved, not yet built · 190 kW
Feb 2022 6.1 km away Energy from waste Slough Heat & Power Station Being built · 50 MW
May 2021 6.2 km away Rooftop solar Twinches Lane - Solar photovoltaic Approved, not yet built · 320 kW
Aug 2021 6.3 km away Rooftop solar The Windsor Boys School, Maidenhead Road - Solar Panels Approved, not yet built · 490 kW
Sept 2025 6.6 km away Rooftop solar Berkshire College Of Agriculture, Burchetts Green Road - Solar Panels Planning application in
May 2026 6.9 km away Rooftop solar Waitrose, King Edward Court - Solar Panel Array Approved, not yet built · 410 kW
Dec 2024 7.3 km away Solar farm Horizon, Hurley - Solar Panels Planning application in · 1 MW
Aug 2022 8.2 km away Road and street works within 1 km 8 permitted works running now or planned, 1 of them major.
Major, planned Hibbert Road, Maidenhead Highway repair and maintenance works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Road closure
Dec 2026 to Dec 2026 500 m away Minor Windsor Road, Maidenhead Highway improvement works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Two-way signals
Oct 2026 to Oct 2026 50 m away Minor Braywick Roundabout, Maidenhead Highway improvement works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · No carriageway incursion
Oct 2026 to Oct 2026 200 m away Minor Braywick Roundabout, Maidenhead Highway improvement works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · No carriageway incursion
Oct 2026 to Oct 2026 200 m away Minor The Binghams, Maidenhead Highway improvement works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Two-way signals
Oct 2026 to Oct 2026 200 m away Minor Windsor Road, Maidenhead Highway improvement works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away Minor Hibbert Road, Maidenhead Highway repair and maintenance works · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Some carriageway incursion
Nov 2026 to Nov 2026 600 m away Minor Braywick Road Service Road, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · No carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2016 3.4 km away Decided decided Nov 2023 6.1 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 12.3 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 16.4 km away Pre-application application due December 2027 18.1 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Iomart, Clivemont Road - Solar Panels (rooftop solar, 3.1 km); Slough Sewage Treatment Works (other, 5.0 km); Fibrepower, Slough (energy from waste, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.