Country England and Wales › Region South East › Council Windsor and Maidenhead › Neighbourhood Maidenhead Central › Postcode SL6 1HG What's changing near SL6 1HG Within 2 km, around Maidenhead Central in Windsor and Maidenhead. Building, planning, schools, transport, prices and crime.
730 new homes completed within 2 km, last 2 years
539 homes given permission on brownfield sites since 2021
+0.3% like-for-like prices in Maidenhead Central, 2024 → 2025 (council +1.8%)
-12% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 20 new homes completed houses · Jul 2026 – Oct 2026
planned Oct 2026 1.5 km away New homes 14 new homes completed flats · Oct 2026
planned Oct 2026 1.5 km away New homes 14 new homes completed flats · Dec 2025 – Oct 2026
Oct 2026 900 m away New homes 9 new homes completed houses · Oct 2026
Oct 2026 950 m away New homes 35 new homes completed 19 flats, 16 houses · Mar 2026 – Sep 2026
Sept 2026 1.6 km away New homes 50 new homes completed flats · Sep 2026
Sept 2026 800 m away New homes 26 new homes completed flats · Sep 2026
Sept 2026 850 m away New homes 33 new homes completed flats · Sep 2026
Sept 2026 850 m away New homes 41 new homes completed flats · Sep 2026
Sept 2026 800 m away New homes 6 new homes completed flats · Nov 2025 – Sep 2026
Sept 2026 850 m away New homes 48 new homes completed flats · Jul 2026 – Sep 2026
Sept 2026 1.6 km away New homes 5 new homes completed houses · Aug 2026
Sept 2026 950 m away 22 homes extended 2021–2025, typically adding 31 m²
33 since energy certificates began (2008)
4 in SL6 1HG itself
Extended certificate 2026 Extended certificate 2022 Extended certificate 2022 Extended certificate 2021 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 3 running (51 MW between them). Those within 5 km are on the map above.
Rooftop solar Furze Platt Senior School, Furze Platt Road - Solar Panels Approved, not yet built · 250 kW
May 2023 2.0 km away Rooftop solar Berkshire College Of Agriculture, Burchetts Green Road - Solar Panels Planning application in
May 2026 5.2 km away Solar farm Horizon, Hurley - Solar Panels Planning application in · 1 MW
Aug 2022 6.3 km away Rooftop solar Globe Business Park, Fieldhouse Lane - PV Panels Approved, not yet built
Jan 2023 6.4 km away Rooftop solar Lynch Hill School Primary Academy, Garrard Road - Solar Panels Approved, not yet built · 260 kW
Aug 2024 6.4 km away Energy from waste Slough Heat & Power Station Being built · 50 MW
May 2021 6.9 km away Rooftop solar Unit 2a, Slough Retail Park - Solar Panels Approved, not yet built · 190 kW
Feb 2022 7.2 km away Rooftop solar Twinches Lane - Solar photovoltaic Approved, not yet built · 320 kW
Aug 2021 7.3 km away Rooftop solar Thomas Road, Wooburn Industrial Estate - Solar Panels Approved, not yet built · 420 kW
Nov 2023 7.4 km away Rooftop solar Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic Approved, not yet built · 1 MW
Jun 2024 7.7 km away Road and street works within 1 km 22 permitted works running now or planned, 5 of them major.
Major West Street, Maidenhead Optional permit (no fee) e.g. for traffic management etc · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · No carriageway incursion
Sept 2026 to Oct 2026 450 m away Major, planned Ross Road, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Road closure
Nov 2026 to Nov 2026 850 m away Major Ross Road, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Road closure
Nov 2026 to Nov 2026 850 m away Major, planned Boyn Hill Road, Maidenhead Utility asset works · CADENT GAS LIMITED · Road closure
Feb 2027 to Feb 2027 900 m away Major Rutland Road, Maidenhead Utility asset works · CADENT GAS LIMITED · Road closure
Feb 2027 to Feb 2027 900 m away Standard King Street, Maidenhead Disconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Standard King Street, Maidenhead Disconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Minor Shoppenhangers Road, Maidenhead Disconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026 400 m away Minor Underhill Close, Maidenhead Works for road purposes · ROYAL BOROUGH OF WINDSOR AND MAIDENHEAD · Give and take
Nov 2026 to Nov 2026 400 m away Major infrastructure projects within 30 km Decided decided Sept 2016 4.0 km away Decided decided Nov 2023 6.9 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 11.9 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 17.8 km away Pre-application application due December 2027 19.6 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Iomart, Clivemont Road - Solar Panels (rooftop solar, 1.0 km); Slough Sewage Treatment Works (other, 6.3 km); Fibrepower, Slough (energy from waste, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.