Country England and Wales › Region South East › Council Bracknell Forest › Neighbourhood Winkfield & Cranbourne › Postcode SL4 4TF What's changing near SL4 4TF Within 2 km, around Winkfield & Cranbourne in Bracknell Forest. Building, planning, schools, transport, prices and crime.
11 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.7% like-for-like prices in Winkfield & Cranbourne, 2024 → 2025 (council +2.4%)
+26% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 17 m²
4 since energy certificates began (2008)
0 in SL4 4TF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 6 running (62 MW between them). Those within 5 km are on the map above.
Rooftop solar Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic Approved, not yet built · 1 MW
Jun 2024 2.1 km away Rooftop solar Russells Farm, Windsor Great Park - Solar panels Approved, not yet built · 210 kW
Dec 2023 2.9 km away Rooftop solar Ascot Racecourse, High Street - Solar Panels Approved, not yet built
Apr 2026 4.2 km away Rooftop solar Heatherwood Hospital, Brook Avenue - Solar Panels Approved, not yet built · 280 kW
Dec 2025 4.5 km away Battery storage Heatherwood Hospital, Brook Avenue - Battery Energy Storage Approved, not yet built
Jan 2026 4.5 km away Rooftop solar The Windsor Boys School, Maidenhead Road - Solar Panels Approved, not yet built · 490 kW
Sept 2025 5.1 km away Solar farm Parkside, Wick Lane - Solar Photovoltaic Panels Approved, not yet built · 250 kW
Feb 2025 5.4 km away Rooftop solar Waitrose, King Edward Court - Solar Panel Array Approved, not yet built · 410 kW
Dec 2024 5.5 km away Rooftop solar Charters School, Charters Road - Solar Panels Approved, not yet built · 450 kW
Jun 2024 6.3 km away Rooftop solar Windlesham Garden Centre, London Road - Solar Panels Planning application in
Jul 2025 7.2 km away Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2016 7.3 km away Decided decided Nov 2023 8.9 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 14.0 km away Pre-application application due December 2027 15.1 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 16.3 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Slough Sewage Treatment Works (other, 6.9 km); Wraysbury Landfill (solar farm, 8.6 km); Fibrepower, Slough (energy from waste, 9.0 km); Trumps Farm Landfill Scheme (landfill gas, 9.6 km); Iomart, Clivemont Road - Solar Panels (rooftop solar, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.