Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
1,180hours of spills in 2025 between them (typical neighbourhood: about 36)
196spill events counted
United Utilities
Wilmslow Wastewater Treatment Worksinto River Dean71 spills, 703 hours in 2025
1.3 km away
United Utilities
Wilmslow Wastewater Treatment Worksinto River Dean51 spills, 224 hours in 2025
1.3 km away
United Utilities
Rear Of Knowle Houseinto Trib River Dean48 spills, 137 hours in 2025
1.6 km away
United Utilities
Quarry Bank Mill Cso 272m4into Tributary Of River Bollin15 spills, 61 hours in 2025
750 m away
United Utilities
Reeman Court Manhole H4 Cso 272nyinto River Dean9 spills, 48 hours in 2025
1.3 km away
United Utilities
The Carrs Combined Sewer Overflowinto River Bollin2 spills, 8 hours in 2025
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 18.1 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 18.9 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Adswood Road - Battery Energy StorageApproved, not yet built
Aug 2025 6.1 km away
Battery storage
Woodford Road - Battery Energy Storage SystemApproved, not yet built · 100 MW
May 2025 6.2 km away
Running nearest: South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 5.1 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 8.0 km); West Didsbury Battery Storage (battery storage, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Sept 2025 22.4 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 24.1 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 25.3 km away
Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
application due July 2027 26.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.