Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 24.1 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 25.1 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Adswood: +41% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.5% in two years.
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025 2.9 km away
Rooftop solar
The Adidas Centre, Hazel Grove - Solar ArrayApproved, not yet built · 640 kW
Feb 2023 3.1 km away
Running nearest: Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 2.0 km); South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 4.1 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 4.3 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 6.2 km); West Didsbury Battery Storage (battery storage, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due April 2027 25.3 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 27.6 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.