Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
1,298hours of spills in 2025 between them (typical neighbourhood: about 36)
320spill events counted
United Utilities
Stockport Wwtwinto River Mersey82 spills, 437 hours in 2025
1.7 km away
United Utilities
650yds Ds Kingway Rvr Bridge Csointo River Mersey48 spills, 219 hours in 2025
1.1 km away
United Utilities
Stockport Wwtwinto River Mersey18 spills, 196 hours in 2025
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 22.5 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 23.9 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Gatley North: +27% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.
A G Parfett and Son, Didsbury Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 3.6 km away
Rooftop solar
Heaton Norris - Solar PV PanelApproved, not yet built · 200 kW
Aug 2022 3.6 km away
Running nearest: South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 1.6 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 3.5 km); West Didsbury Battery Storage (battery storage, 4.8 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 6.2 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Kingsway, CheadleHighway repair and maintenance works · NATIONAL HIGHWAYS · Lane closure
Oct 2026 to Oct 2026 400 m away
Minor
Springfield Road, CheadleHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 750 m away
Minor
Foxland Road, CheadleRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
application due April 2027 24.0 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 25.0 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.