What's changing near SK7 6AD
Within 2 km, around Hazel Grove East & South in Stockport. Building, planning, schools, transport, prices and crime.
68new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.5%like-for-like prices in Hazel Grove East & South, 2024 → 2025 (council +4.2%)
–crime data not published here (Greater Manchester)
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
41 new homes completed28 flats, 13 houses · Nov 2024 – Feb 2026
Feb 2026
250 m away - New homes
5 new homes completedflats · Oct 2025
Oct 2025
1.0 km away - School closed
School closed: Norbury Court SchoolOther independent school, other independent school (closure)
Jul 2025
1.3 km away - New homes
6 new homes completedhouses · Apr 2025
Apr 2025
1.3 km away - New homes
11 new homes completedhouses · Jan 2025
Jan 2025
250 m away - New school
New school: Norbury Court SchoolOther independent school, other independent school
Apr 2020
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 39 m²
20since energy certificates began (2008)
1in SK7 6AD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
731hours of spills in 2025 between them (typical neighbourhood: about 36)
71spill events counted
- United Utilities
Poynton Tanks Csointo Norbury Brook53 spills, 659 hours in 2025
1.5 km away - United Utilities
Opp 255 Buxton Roadinto Hazel Grove Brook9 spills, 36 hours in 2025
1.1 km away - United Utilities
Torkington Road Csointo Trib Of Ocherley Brook2 spills, 25 hours in 2025
1000 m away - United Utilities
Hazelwood Road Cso 435gyinto Poise Brook Trib Rvr Goyt7 spills, 11 hours in 2025
750 m away - United Utilities
Corfe Crescent Csointo Norbury Brook Via Sws0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 7 running (32 MW between them). Those within 5 km are on the map above.
- Battery storage
Newby Road, Hazel Grove - Battery StorageApproved, not yet built · 8 MW
Nov 2022
1.2 km away - Rooftop solar
Sainsburys, London Road - Solar PanelsApproved, not yet built · 500 kW
Sept 2025
1.3 km away - Rooftop solar
The Adidas Centre, Hazel Grove - Solar ArrayApproved, not yet built · 640 kW
Feb 2023
2.0 km away - Solar farm
Torkington Road, Hazel Grove - Solar PV PanelsPlanning application in · 30 MW
Jun 2025
2.1 km away - Rooftop solar
Bramhall High School, Seal Road - Solar ArrayApproved, not yet built · 250 kW
May 2023
2.8 km away - Battery storage
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageApproved, not yet built · 40 MW
Aug 2024
3.7 km away - Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025
4.2 km away - Battery storage
Woodford Road - Battery Energy Storage SystemApproved, not yet built · 100 MW
May 2025
4.3 km away - Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023
4.6 km away - Battery storage
Adswood Road - Battery Energy StorageApproved, not yet built
Aug 2025
4.6 km away
Road and street works within 1 km
11 permitted works running now or planned, 5 of them major.
- Major, planned
Macclesfield Road, StockportWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026
50 m away - Major
Kyle Road, StockportUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026
350 m away - Major
Tannock Road, StockportUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026
350 m away - Major
Lochmaddy Close, StockportUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026
400 m away - Major, planned
Dean Lane, StockportHighway repair and maintenance works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · Road closure
Dec 2026 to Dec 2026
900 m away - Standard
Dunvegan Road, StockportUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away - Standard
Lever Street, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
900 m away - Minor
Buxton Road, StockportOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Multi-way signals
Nov 2026 to Nov 2026
100 m away - Minor
Buxton Road, StockportOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Multi-way signals
Dec 2026 to Dec 2026
100 m away
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
11.7 km away - Decideddecided Aug 2014
19.5 km away - Decideddecided Sept 2025
21.8 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
27.3 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
27.5 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 4.8 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 5.4 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 5.8 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 8.4 km); South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.