What's changing near SK7 3BE
Within 2 km, around Bramhall North East in Stockport. Building, planning, schools, transport, prices and crime.
13new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.0%like-for-like prices in Bramhall North East, 2024 → 2025 (council +4.2%)
–crime data not published here (Greater Manchester)
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 34 m²
34since energy certificates began (2008)
2in SK7 3BE itself
- Extendedcertificate 2025
- Extendedcertificate 2025
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
439hours of spills in 2025 between them (typical neighbourhood: about 36)
154spill events counted
- United Utilities
Carr Wood Combined Sewer Overflowinto Carr Brook83 spills, 242 hours in 2025
1.6 km away - United Utilities
Bramhall Park Csointo Lady Brook43 spills, 160 hours in 2025
1.5 km away - United Utilities
Bramhall Island Csointo Lady Brook12 spills, 19 hours in 2025
1000 m away - United Utilities
50 Bridge Lane Bramhall Csointo Lady Brook5 spills, 10 hours in 2025
900 m away - United Utilities
Bramhall Ln Sth (No 221)into Micker Brook11 spills, 9 hours in 2025
850 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
44 planned, approved or being built and 7 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The Adidas Centre, Hazel Grove - Solar ArrayApproved, not yet built · 640 kW
Feb 2023
900 m away - Rooftop solar
Bramhall High School, Seal Road - Solar ArrayApproved, not yet built · 250 kW
May 2023
1.6 km away - Battery storage
Newby Road, Hazel Grove - Battery StorageApproved, not yet built · 8 MW
Nov 2022
1.7 km away - Battery storage
Adswood Road - Battery Energy StorageApproved, not yet built
Aug 2025
1.7 km away - Rooftop solar
Sainsburys, London Road - Solar PanelsApproved, not yet built · 500 kW
Sept 2025
1.9 km away - Rooftop solar
Hercules Office Park, Bird Hall Lane - Solar ArraysApproved, not yet built · 200 kW
Oct 2023
2.2 km away - Rooftop solar
Bird Hall Lane, Cheadle Heath - Solar PanelsApproved, not yet built · 510 kW
Mar 2026
2.6 km away - Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025
2.7 km away - Rooftop solar
Life Leisure Grand Central, Grand Central Square - Solar PanelsApproved, not yet built · 180 kW
Dec 2022
2.9 km away - Rooftop solar
Cheadle Hulme School, Claremont Road - Solar PanelsApproved, not yet built · 300 kW
Oct 2023
3.0 km away
Road and street works within 1 km
5 permitted works running now or planned.
- Standard
Frewland Avenue, StockportNew service connection · SP Electricity North West · Give and take
Feb 2027 to Feb 2027
700 m away - Standard
Frewland Avenue, StockportNew service connection · SP Electricity North West · Give and take
Feb 2027 to Feb 2027
700 m away - Minor
Midland Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Stop/go boards
Nov 2026 to Nov 2026
200 m away - Minor
Thurlestone Drive, StockportUtility repair and maintenance works · VIRGIN MEDIA · Give and take
Oct 2026 to Oct 2026
800 m away - Minor
Bramhall Lane South, StockportUtility repair and maintenance works · United Utilities Water Ltd · Two-way signals
Nov 2026 to Nov 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
13.1 km away - Decideddecided Aug 2014
17.0 km away - Decideddecided Sept 2025
20.0 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
25.3 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
25.9 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 3.1 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 4.0 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 5.8 km); South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 6.2 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.