Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
332hours of spills in 2025 between them (typical neighbourhood: about 36)
68spill events counted
United Utilities
Coppiceside Ps Disleyinto Bollinhurst Brook31 spills, 263 hours in 2025
1.4 km away
United Utilities
Opp 255 Buxton Roadinto Hazel Grove Brook9 spills, 36 hours in 2025
1.4 km away
United Utilities
Buxton Rd Andrew Ln Cso 435gxinto Unnamed Brook28 spills, 33 hours in 2025
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 28.9 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 29.0 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in High Lane: +27% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 6.6 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 7.1 km); Arden Quarry Landfill (landfill gas, 7.3 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 7.7 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due April 2027 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.