Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
20storm overflows within 2 km
828hours of spills in 2025 between them (typical neighbourhood: about 36)
376spill events counted
United Utilities
Hope Street Combined Sewer Overflowinto River Mersey84 spills, 184 hours in 2025
1.5 km away
United Utilities
Penny Lane Grimesbottom Cso 43122into River Tame35 spills, 138 hours in 2025
350 m away
United Utilities
Wellington Road South Csointo River Mersey50 spills, 115 hours in 2025
1.3 km away
United Utilities
Princes Street Csointo River Mersey54 spills, 114 hours in 2025
950 m away
United Utilities
Travis Brow/Georges Road Csointo River Mersey56 spills, 86 hours in 2025
1.7 km away
United Utilities
Great Underbank Cso 43200 Stk0039into Clvrt Section Of River Mersey39 spills, 75 hours in 2025
1.1 km away
United Utilities
Newbridge Lane Csointo River Goyt2 spills, 28 hours in 2025
1.3 km away
United Utilities
Avenue St Brewery St Csointo River Goyt11 spills, 26 hours in 2025
Life Leisure Grand Central, Grand Central Square - Solar PanelsApproved, not yet built · 180 kW
Dec 2022 1.5 km away
Rooftop solar
Heaton Norris - Solar PV PanelApproved, not yet built · 200 kW
Aug 2022 1.6 km away
Rooftop solar
A G Parfett and Son, Didsbury Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 1.6 km away
Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023 1.8 km away
Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025 1.8 km away
Rooftop solar
Mercedes Benz, Heaton Mersey - Solar PanelsApproved, not yet built · 200 kW
Jul 2023 2.0 km away
Battery storage
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025 2.5 km away
Battery storage
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageApproved, not yet built · 40 MW
Aug 2024 3.1 km away
Road and street works within 1 km
14 permitted works running now or planned, 10 of them major.
Major
Passageway From Greg Street To Three Acres Drive, StockportUtility repair and maintenance works · United Utilities Water Ltd · No carriageway incursion
Sept 2026 to Oct 2026 800 m away
Major
Three Acres Drive, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Sept 2026 to Oct 2026 800 m away
Major
Alderley Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Dec 2026 900 m away
Major, planned
Wellington Road North, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · Lane closure
Oct 2026 to Oct 2026 900 m away
Major
Eastcote Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Nov 2026 900 m away
Major
Handforth Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Nov 2026 to Nov 2026 900 m away
Major
Eastcote Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away
Major
Stitch Lane, StockportUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 27.6 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 28.6 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 28.8 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in South Reddish & Heaton Norris: +31% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.0% in two years.
New-home postcodes with fewer than 5 homes are counted above but not listed. 24 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Bird Hall Lane, Cheadle Heath - Solar PanelsApproved, not yet built · 510 kW
Mar 2026 3.2 km away
Rooftop solar
Tesco Burnage StoreApproved, not yet built · 1 MW
Jan 2020 3.4 km away
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 1.6 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 1.9 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.0 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 3.6 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Wellington Road North, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · Lane closure
Oct 2026 to Oct 2026 950 m away
Major
St Marys Drive, StockportUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Nov 2026 1000 m away
Standard
Wellington Road North, StockportHighway repair and maintenance works · SP Electricity North West · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away
Minor
Belmont Way, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · Two-way signals
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 29.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.