Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
250hours of spills in 2025 between them (typical neighbourhood: about 36)
85spill events counted
United Utilities
Penny Lane Grimesbottom Cso 43122into River Tame35 spills, 138 hours in 2025
1.3 km away
United Utilities
Newbridge Lane Csointo River Goyt2 spills, 28 hours in 2025
1.7 km away
United Utilities
Avenue St Brewery St Csointo River Goyt11 spills, 26 hours in 2025
1.7 km away
United Utilities
Thornley Lane South Cso 44019into Unnamed Trib Denton Brk Sws10 spills, 22 hours in 2025
1.8 km away
United Utilities
Brinnington Rise Cso 431gdinto River Tame4 spills, 12 hours in 2025
900 m away
United Utilities
Newbridge Ln Cromer St Cso 432htinto River Goyt1 spills, 9 hours in 2025
1.8 km away
United Utilities
Junc Stringer St/New Bridge Ln Csointo River Goyt7 spills, 6 hours in 2025
1.9 km away
United Utilities
Carrington Rd/Offerton Stinto River Goyt9 spills, 5 hours in 2025
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025 2.0 km away
Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023 2.1 km away
Rooftop solar
Decathlon, Georges Road - Solar Pv SystemApproved, not yet built · 150 kW
Apr 2024 2.3 km away
Rooftop solar
Life Leisure Grand Central, Grand Central Square - Solar PanelsApproved, not yet built · 180 kW
Dec 2022 2.6 km away
Rooftop solar
Heaton Norris - Solar PV PanelApproved, not yet built · 200 kW
Aug 2022 2.6 km away
Rooftop solar
A G Parfett and Son, Didsbury Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 2.7 km away
Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025 2.7 km away
Rooftop solar
Gorton Education Village, Wembley Road - Solar PanelsApproved, not yet built · 600 kW
Nov 2025 2.8 km away
Rooftop solar
Mercedes Benz, Heaton Mersey - Solar PanelsApproved, not yet built · 200 kW
Jul 2023 3.1 km away
Road and street works within 1 km
10 permitted works running now or planned, 8 of them major.
Major
St Marys Drive, StockportUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Nov 2026 300 m away
Major
Alderley Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Dec 2026 350 m away
Major
Handforth Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Nov 2026 to Nov 2026 400 m away
Major
Eastcote Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Nov 2026 500 m away
Major
Eastcote Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Major
Broadstone Hall Road South, StockportUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Nov 2026 550 m away
Major
Three Acres Drive, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Sept 2026 to Oct 2026 600 m away
Major
Passageway From Greg Street To Three Acres Drive, StockportUtility repair and maintenance works · United Utilities Water Ltd · No carriageway incursion
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 28.6 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 29.0 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Central Reddish: +35% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.