222new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.0%like-for-like prices in Dane Bank, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
47 new homes completedhouses · Sep 2025 – Sep 2026
Sept 2026
1.9 km away - New homes
14 new homes completedhouses · Jul 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
40 new homes completedhouses · Mar 2026 – Sep 2026
Sept 2026
2.0 km away - New homes
12 new homes completedhouses · Sep 2025 – Aug 2026
Aug 2026
1.9 km away - New homes
15 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
2.0 km away - New homes
14 new homes completedhouses · Mar 2026
Apr 2026
2.0 km away - New homes
12 new homes completedhouses · Sep 2025 – Dec 2025
Dec 2025
1.8 km away - New homes
14 new homes completedflats · Jun 2025
Jun 2025
1.8 km away - New homes
17 new homes completedflats · May 2025
May 2025
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 32 m²
25since energy certificates began (2008)
0in SK5 6TA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
591hours of spills in 2025 between them (typical neighbourhood: about 36)
262spill events counted
- United Utilities
Rear Of Kennedy Way Csointo Denton Brook Via Sws83 spills, 231 hours in 2025
1.3 km away - United Utilities
Ross Lave Lane Csointo Unnamed Trib Of Denton Brook65 spills, 178 hours in 2025
1.4 km away - United Utilities
Town Lane Circular Road Cso 44020into Denton Brook Trib River Tame46 spills, 90 hours in 2025
1.7 km away - United Utilities
Victoria St/Acre St Cso (442wa)into Denton Brook Via Sws34 spills, 37 hours in 2025
1.5 km away - United Utilities
Thornley Lane South Cso 44019into Unnamed Trib Denton Brk Sws10 spills, 22 hours in 2025
250 m away - United Utilities
Shoecroft Garage Site Csointo Denton Brook Via Sws15 spills, 19 hours in 2025
1.7 km away - United Utilities
Windmill Lane Cso 44012into Denton Brook Via Clvr Wcourse9 spills, 14 hours in 2025
950 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
81 planned, approved or being built and 14 running (119 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Gorton Education Village, Wembley Road - Solar PanelsApproved, not yet built · 600 kW
Nov 2025
1.8 km away - Rooftop solar
Morrisons Superstore, Saxon Street - Solar panelsApproved, not yet built · 460 kW
May 2024
2.6 km away - Battery storage
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025
3.0 km away - Rooftop solar
Hammerstone Road Depot - Solar PanelsApproved, not yet built
Nov 2023
3.1 km away - Rooftop solar
Co Op Academy Belle Vue, Hyde Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2026
3.2 km away - Rooftop solar
New Smithfield Market, Whitworth Street East -Solar PanelsApproved, not yet built · 270 kW
Dec 2024
3.3 km away - Rooftop solar
New Smithfield Market - Solar PanelsApproved, not yet built · 160 kW
Dec 2024
3.3 km away - Battery storage
Welkin Mill, Welkin Road - Battery StorageBeing built · 50 MW
Jan 2024
3.4 km away - Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023
3.8 km away - Rooftop solar
Ashton Old Road - Solar PanelsApproved, not yet built · 390 kW
Jun 2022
3.9 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major
Station Road, StockportUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Jan 2027 to Jan 2027
950 m away - Standard
Gainford Road, StockportUtility asset works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
9.6 km away - Decideddecided Sept 2025
13.6 km away - Decideddecided Aug 2014
20.5 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 1.0 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 2.4 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.1 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 3.5 km); Outer Space Studios Solar Panels (rooftop solar, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.