Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
411hours of spills in 2025 between them (typical neighbourhood: about 36)
60spill events counted
United Utilities
Hazel Grove Wwtwinto River Goyt38 spills, 361 hours in 2025
1.9 km away
United Utilities
Newbridge Lane Csointo River Goyt2 spills, 28 hours in 2025
1.9 km away
United Utilities
Newbridge Ln Cromer St Cso 432htinto River Goyt1 spills, 9 hours in 2025
1.8 km away
United Utilities
Junc Stringer St/New Bridge Ln Csointo River Goyt7 spills, 6 hours in 2025
1.8 km away
United Utilities
Carrington Rd/Offerton Stinto River Goyt9 spills, 5 hours in 2025
1.9 km away
United Utilities
Junc Stringer St/New Bridge Ln Csointo River Goyt Via Sws2 spills, 3 hours in 2025
1.8 km away
United Utilities
Lancaster Street Cso 432cdinto River Goyt Via Sws1 spills, 1 hours in 2025
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 27.5 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 28.2 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Offerton West: +34% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.0% in two years.
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025 3.1 km away
Rooftop solar
A G Parfett and Son, Didsbury Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 3.2 km away
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 1.9 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 2.8 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.5 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 5.6 km); South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due April 2027 28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.