What's changing near SK2 5DR
Within 2 km, around Offerton East & Bosden Farm in Stockport. Building, planning, schools, transport, prices and crime.
70new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.9%like-for-like prices in Offerton East & Bosden Farm, 2024 → 2025 (council +4.2%)
–crime data not published here (Greater Manchester)
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Oct 2025
Oct 2025
1.9 km away - New homes
12 new homes completedflats · May 2025
Jun 2025
950 m away - New homes
14 new homes completed2 flats, 12 houses · May 2025
May 2025
900 m away - New homes
8 new homes completed2 flats, 6 houses · May 2025
May 2025
900 m away - New homes
11 new homes completedhouses · Nov 2024
Nov 2024
950 m away - New homes
5 new homes completedflats · Nov 2024
Nov 2024
1.9 km away - New schoolJan 2021
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 23 m²
31since energy certificates began (2008)
0in SK2 5DR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
1,640hours of spills in 2025 between them (typical neighbourhood: about 36)
332spill events counted
- United Utilities
Otterspool Road Csointo The River Goyt117 spills, 729 hours in 2025
1.7 km away - United Utilities
Hazel Grove Wwtwinto River Goyt38 spills, 361 hours in 2025
1.1 km away - United Utilities
Hurstheads Lane/Green Lane Csointo River Goyt81 spills, 299 hours in 2025
1.9 km away - United Utilities
Bongs Valley Pumping Stationinto River Goyt54 spills, 170 hours in 2025
1.2 km away - United Utilities
Bongs Road Combined Sewer Overflowinto River Goyt35 spills, 72 hours in 2025
1.3 km away - United Utilities
Higher Bents Lane/Newlyn Dr Csointo Bredbury Stream Via Sws7 spills, 9 hours in 2025
1.9 km away - United Utilities
Marple Road Cso (432ev) (Stk0096)into Poise Brook0 spills, 0 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
50 planned, approved or being built and 9 running (63 MW between them). Those within 5 km are on the map above.
- Battery storage
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageApproved, not yet built · 40 MW
Aug 2024
900 m away - Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023
1.7 km away - Rooftop solar
Sainsburys, London Road - Solar PanelsApproved, not yet built · 500 kW
Sept 2025
1.9 km away - Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025
1.9 km away - Battery storage
Welkin Mill, Welkin Road - Battery StorageBeing built · 50 MW
Jan 2024
2.1 km away - Battery storage
Newby Road, Hazel Grove - Battery StorageApproved, not yet built · 8 MW
Nov 2022
2.5 km away - Rooftop solar
Life Leisure Grand Central, Grand Central Square - Solar PanelsApproved, not yet built · 180 kW
Dec 2022
2.7 km away - Rooftop solar
The Adidas Centre, Hazel Grove - Solar ArrayApproved, not yet built · 640 kW
Feb 2023
2.7 km away - Battery storage
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025
2.8 km away - Rooftop solar
Decathlon, Georges Road - Solar Pv SystemApproved, not yet built · 150 kW
Apr 2024
3.3 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
10.1 km away - Decideddecided Sept 2025
19.0 km away - Decideddecided Aug 2014
19.7 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
28.2 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
28.9 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 2.0 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.1 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 3.5 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 5.5 km); Godley Water Treatment Works (solar farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.