Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
1,458hours of spills in 2025 between them (typical neighbourhood: about 36)
257spill events counted
United Utilities
Mossley Stwinto River Tame60 spills, 650 hours in 2025
1.4 km away
United Utilities
Mossley Stwinto River Tame48 spills, 444 hours in 2025
1.4 km away
United Utilities
Grove Road Csointo River Tame71 spills, 246 hours in 2025
1.8 km away
United Utilities
Canal Bank Transformer Hse Csointo Swineshaw Brook Trib Rvr Tame33 spills, 63 hours in 2025
1.8 km away
United Utilities
Off Grove Road Cso 44217into Clvrt Sect Swineshaw Brook9 spills, 20 hours in 2025
1.8 km away
United Utilities
Dark Lane Cso 441shinto Unnamed Trib River Tame7 spills, 19 hours in 2025
1.8 km away
United Utilities
Stamford St Cso (442sc)into Swineshaw Brook Via Sws2 spills, 5 hours in 2025
1.7 km away
United Utilities
Manchester Road Csointo River Tame18 spills, 3 hours in 2025
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Carrbrook & Micklehurst: +42% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.
Burlington Street - Solar PV PanelsApproved, not yet built · 910 kW
Jan 2024 6.4 km away
Rooftop solar
Glossop Caravans, Brookfield - Solar PanelsApproved, not yet built · 230 kW
Aug 2025 6.5 km away
Running nearest: Scouthead Power Plant (landfill gas, 5.4 km); Godley Water Treatment Works (solar farm, 6.3 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.