Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stalybridge South: +27% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.0% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Glossop Caravans, Brookfield - Solar PanelsApproved, not yet built · 230 kW
Aug 2025 3.8 km away
Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024 4.1 km away
Running nearest: Godley Water Treatment Works (solar farm, 2.5 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 7.2 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 7.3 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 9.2 km); Scouthead Power Plant (landfill gas, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Wildbank Chase, StalybridgeDisconnection or alteration of supply · TAMESIDE METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Dec 2026 to Dec 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.