What's changing near SK15 2QS
Within 2 km, around Stalybridge South in Tameside. Building, planning, schools, transport, prices and crime.
38new homes completed within 2 km, last 2 years
90homes given permission on brownfield sites since 2021
+4.1%like-for-like prices in Stalybridge South, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 21 m²
37since energy certificates began (2008)
2in SK15 2QS itself
- Extendedcertificate 2023
- Extendedcertificate 2012
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
27storm overflows within 2 km
843hours of spills in 2025 between them (typical neighbourhood: about 36)
329spill events counted
- United Utilities
Grove Road Csointo River Tame71 spills, 246 hours in 2025
1.7 km away - United Utilities
Corporation Streetinto River Tame75 spills, 215 hours in 2025
350 m away - United Utilities
Tame Street/Park Road Csointo River Tame50 spills, 178 hours in 2025
1.5 km away - United Utilities
Tbcinto River Tame53 spills, 69 hours in 2025
200 m away - United Utilities
Canal Bank Transformer Hse Csointo Swineshaw Brook Trib Rvr Tame33 spills, 63 hours in 2025
1.7 km away - United Utilities
Off Grove Road Cso 44217into Clvrt Sect Swineshaw Brook9 spills, 20 hours in 2025
1.6 km away - United Utilities
Rassbottom Street Csointo River Tame3 spills, 12 hours in 2025
1000 m away - United Utilities
Fern Bank Csointo Stocks Brook7 spills, 9 hours in 2025
550 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
51 planned, approved or being built and 9 running (36 MW between them). Those within 5 km are on the map above.
- Battery storage
Printworks Road - Stalybridge Battery StorageApproved, not yet built · 150 MW
Dec 2023
1.4 km away - Battery storage
Tame Box, Tame Street - Battery StorageApproved, not yet built · 200 kW
Oct 2022
1.4 km away - Landfill gas
Tame Power - Flexible Energy FacilityApproved, not yet built · 5 MW
Dec 2024
1.6 km away - Rooftop solar
Tameside General Hospital, Fountain Street - Solar PanelsPlanning application in · 310 kW
Jun 2026
1.8 km away - Other
Tameside General Hospital - Energy CentrePlanning application in · 2 MW
May 2026
1.8 km away - Battery storage
Holden WayApproved, not yet built · 6 MW
Jun 2018
1.9 km away - Rooftop solar
Tameside College, Beaufort Road - Solar PanelsApproved, not yet built · 400 kW
Sept 2025
2.2 km away - Battery storage
Sheffield Road - Battery Storage SystemApproved, not yet built
Sept 2022
3.0 km away - Rooftop solar
Morrisons Superstore, Mottram Road - Solar PanelsApproved, not yet built · 480 kW
Nov 2025
3.7 km away - Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024
3.7 km away - Battery storage
Road and street works within 1 km
15 permitted works running now or planned, 10 of them major.
- Major, planned
Corporation Street, StalybridgeHighway repair and maintenance works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
350 m away - Major
Corporation Street, StalybridgeHighway repair and maintenance works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
350 m away - Major, planned
Corporation Street, StalybridgeHighway improvement works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Feb 2027
500 m away - Major
Corporation Street, StalybridgeHighway improvement works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Feb 2027
500 m away - Major, planned
Melbourne Street, StalybridgeHighway improvement works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Feb 2027
550 m away - Major
Melbourne Street, StalybridgeHighway improvement works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Feb 2027
550 m away - Major, planned
Castle Street, StalybridgeHighway improvement works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Feb 2027
600 m away - Major
Castle Street, StalybridgeHighway improvement works · TAMESIDE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Feb 2027
600 m away - Major, planned
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
3.9 km away - Decideddecided Sept 2025
15.9 km away - Decideddecided Aug 2014
28.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 3.1 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 6.7 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 7.5 km); Scouthead Power Plant (landfill gas, 8.2 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.