What's changing near SK1 4EN
Within 2 km, around Heaviley in Stockport. Building, planning, schools, transport, prices and crime.
627new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.0%like-for-like prices in Heaviley, 2024 → 2025 (council +4.2%)
–crime data not published here (Greater Manchester)
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedflats · Aug 2026
Aug 2026
1.1 km away - New homes
73 new homes completedflats · Jul 2026
Jul 2026
1.6 km away - New homes
5 new homes completedflats · Jul 2026
Jul 2026
1.2 km away - New homes
5 new homes completedflats · May 2026
May 2026
1.2 km away - New homes
7 new homes completedflats · Mar 2026
Mar 2026
1.0 km away - New homes
53 new homes completedflats · Feb 2025 – Jan 2026
Jan 2026
1.0 km away - New homes
6 new homes completedflats · Oct 2025
Oct 2025
1.7 km away - New homes
9 new homes completedflats · Aug 2025
Aug 2025
1.1 km away - New homes
66 new homes completedflats · May 2025 – Jul 2025
Jul 2025
900 m away - New homes
65 new homes completedflats · Jul 2025
Jul 2025
900 m away - New homes
12 new homes completedflats · May 2025
Jun 2025
600 m away - New homes
44 new homes completedflats · May 2025
May 2025
1.5 km away - New homes
29 new homes completed
22homes extended 2021–2025, typically adding 32 m²
38since energy certificates began (2008)
1in SK1 4EN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
17storm overflows within 2 km
803hours of spills in 2025 between them (typical neighbourhood: about 36)
365spill events counted
- United Utilities
Hope Street Combined Sewer Overflowinto River Mersey84 spills, 184 hours in 2025
1.8 km away - United Utilities
Penny Lane Grimesbottom Cso 43122into River Tame35 spills, 138 hours in 2025
1.7 km away - United Utilities
Wellington Road South Csointo River Mersey50 spills, 115 hours in 2025
1.4 km away - United Utilities
Princes Street Csointo River Mersey54 spills, 114 hours in 2025
1.3 km away - United Utilities
Travis Brow/Georges Road Csointo River Mersey56 spills, 86 hours in 2025
2.0 km away - United Utilities
Great Underbank Cso 43200 Stk0039into Clvrt Section Of River Mersey39 spills, 75 hours in 2025
1.3 km away - United Utilities
Newbridge Lane Csointo River Goyt2 spills, 28 hours in 2025
1.2 km away - United Utilities
Avenue St Brewery St Csointo River Goyt11 spills, 26 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
60 planned, approved or being built and 12 running (117 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025
400 m away - Rooftop solar
Life Leisure Grand Central, Grand Central Square - Solar PanelsApproved, not yet built · 180 kW
Dec 2022
1.2 km away - Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023
1.2 km away - Battery storage
Welkin Mill, Welkin Road - Battery StorageBeing built · 50 MW
Jan 2024
1.5 km away - Battery storage
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageApproved, not yet built · 40 MW
Aug 2024
1.8 km away - Rooftop solar
Decathlon, Georges Road - Solar Pv SystemApproved, not yet built · 150 kW
Apr 2024
1.8 km away - Rooftop solar
Heaton Norris - Solar PV PanelApproved, not yet built · 200 kW
Aug 2022
2.2 km away - Rooftop solar
A G Parfett and Son, Didsbury Road - Solar PanelsApproved, not yet built · 270 kW
May 2023
2.3 km away - Rooftop solar
Mercedes Benz, Heaton Mersey - Solar PanelsApproved, not yet built · 200 kW
Jul 2023
2.6 km away - Rooftop solar
Sainsburys, London Road - Solar PanelsApproved, not yet built · 500 kW
Sept 2025
2.6 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
- Major, planned
Graham Road, StockportDisconnection or alteration of supply · United Utilities Water Ltd · Road closure
Nov 2026 to Dec 2026
450 m away - Standard
Windermere Road, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
800 m away - Standard
Nangreave Road, StockportDisconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Nov 2026
1000 m away - Minor
Edward Street, StockportUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Nov 2026 to Nov 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
11.0 km away - Decideddecided Sept 2025
17.9 km away - Decideddecided Aug 2014
18.5 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
27.3 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
28.2 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 1.4 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 2.0 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.2 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 5.0 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.