What's changing near SK14 8BF
Within 2 km, around Mottram, Hollingworth & Broadbottom in Tameside. Building, planning, schools, transport, prices and crime.
32new homes completed within 2 km, last 2 years
31homes given permission on brownfield sites since 2021
+2.9%like-for-like prices in Mottram, Hollingworth & Broadbottom, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
1.6 km away - New homes
10 new homes completedhouses · Jul 2026 – Oct 2026
Oct 2026
1.5 km away - New homes
5 new homes completedhouses · Dec 2025
Dec 2025
2.0 km away - Planning permissionMar 2021
600 m away - New schoolDec 2020
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 21 m²
19since energy certificates began (2008)
0in SK14 8BF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
3,499hours of spills in 2025 between them (typical neighbourhood: about 36)
587spill events counted
- United Utilities
Glossop Stwinto Trib River Etherow102 spills, 1,411 hours in 2025
1.3 km away - United Utilities
Tbcinto River Etherow58 spills, 534 hours in 2025
1.4 km away - United Utilities
Melandra Road Pumping Stationinto Glossop Brook87 spills, 444 hours in 2025
1.0 km away - United Utilities
Woodlands Close Cso (21117)into River Etherow82 spills, 342 hours in 2025
1.1 km away - United Utilities
Spring Tavern Cso 218nhinto River Etherow68 spills, 283 hours in 2025
800 m away - United Utilities
Whoolley Lane Cso 44024into River Etherow56 spills, 128 hours in 2025
1.0 km away - United Utilities
Tintwistle Stwinto River Etherow29 spills, 127 hours in 2025
1.1 km away - United Utilities
Woolley Bridge Road Cso 43133into River Etherow40 spills, 119 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
18 planned, approved or being built and 3 running (6 MW between them). Those within 5 km are on the map above.
- Battery storage
Graphite Way, Hadfield - Battery Energy Storage UnitApproved, not yet built
Aug 2023
700 m away - Rooftop solar
Glossop Caravans, Brookfield - Solar PanelsApproved, not yet built · 230 kW
Aug 2025
1.1 km away - Solar farm
Carpenter Plc, Dinting Lodge Industrial Estate - Solar ArrayApproved, not yet built · 1 MW
Mar 2025
1.6 km away - Battery storage
Printworks Road - Stalybridge Battery StorageApproved, not yet built · 150 MW
Dec 2023
5.0 km away - Battery storage
Sheffield Road - Battery Storage SystemApproved, not yet built
Sept 2022
5.1 km away - Battery storage
Tame Box, Tame Street - Battery StorageApproved, not yet built · 200 kW
Oct 2022
5.7 km away - Rooftop solar
Morrisons Superstore, Mottram Road - Solar PanelsApproved, not yet built · 480 kW
Nov 2025
5.7 km away - Landfill gas
Tame Power - Flexible Energy FacilityApproved, not yet built · 5 MW
Dec 2024
5.9 km away - Battery storage
Holden WayApproved, not yet built · 6 MW
Jun 2018
6.2 km away - Rooftop solar
Tameside General Hospital, Fountain Street - Solar PanelsPlanning application in · 310 kW
Jun 2026
6.3 km away - Other
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Taylor Street, HollingworthUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Dec 2026
350 m away - Standard
Watkin Avenue, GlossopNew service connection · SP Electricity North West · Give and take
Oct 2026 to Oct 2026
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
1.1 km away - Decideddecided Sept 2025
20.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 4.6 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 9.2 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.