Country England and Wales › Region North West › Council Tameside › Neighbourhood Mottram, Hollingworth & Broadbottom › Postcode SK14 6AX What's changing near SK14 6AX Within 2 km, around Mottram, Hollingworth & Broadbottom in Tameside. Building, planning, schools, transport, prices and crime.
133 new homes completed within 2 km, last 2 years
156 homes given permission on brownfield sites since 2021
+2.9% like-for-like prices in Mottram, Hollingworth & Broadbottom, 2024 → 2025 (council +4.6%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 30 new homes completed houses · Oct 2024 – Mar 2025
Mar 2025 1.4 km away New homes 8 new homes completed houses · Oct 2024 – Mar 2025
Mar 2025 1.4 km away New homes 91 new homes completed flats · Mar 2025
Mar 2025 1.4 km away New school May 2024 1.2 km away Planning permission Jul 2021 2.0 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 25 m²
11 since energy certificates began (2008)
1 in SK14 6AX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 9 storm overflows within 2 km
2,417 hours of spills in 2025 between them (typical neighbourhood: about 36)
307 spill events counted
United Utilities Glossop Stw into Trib River Etherow 102 spills, 1,411 hours in 2025
1.7 km away United Utilities Tbc into River Etherow 58 spills, 534 hours in 2025
1.7 km away United Utilities Chisworth Marple Road Wwnps into Chisworth Brook 54 spills, 170 hours in 2025
1.7 km away United Utilities Charlesworth Pumping Station into River Etherow 13 spills, 128 hours in 2025
600 m away United Utilities Whoolley Lane Cso 44024 into River Etherow 56 spills, 128 hours in 2025
1.9 km away United Utilities Well Row Cso 442xk into River Etherow 21 spills, 31 hours in 2025
100 m away United Utilities Broadbottom Pumping Station into River Etherow 3 spills, 16 hours in 2025
900 m away United Utilities Clough End Road Cso 441ks into Hurst Clough Brook 0 spills, 0 hours in 2025
900 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 25 planned, approved or being built and 5 running (29 MW between them). Those within 5 km are on the map above.
Rooftop solar Glossop Caravans, Brookfield - Solar Panels Approved, not yet built · 230 kW
Aug 2025 2.3 km away Solar farm Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array Approved, not yet built · 1 MW
Mar 2025 2.5 km away Battery storage Graphite Way, Hadfield - Battery Energy Storage Unit Approved, not yet built
Aug 2023 3.4 km away Battery storage Sheffield Road - Battery Storage System Approved, not yet built
Sept 2022 4.0 km away Rooftop solar Morrisons Superstore, Mottram Road - Solar Panels Approved, not yet built · 480 kW
Nov 2025 4.3 km away Rooftop solar Concordia - Solar Panels Approved, not yet built · 240 kW
Jan 2024 5.7 km away Battery storage Tame Box, Tame Street - Battery Storage Approved, not yet built · 200 kW
Oct 2022 5.8 km away Landfill gas Tame Power - Flexible Energy Facility Approved, not yet built · 5 MW
Dec 2024 6.1 km away Battery storage Printworks Road - Stalybridge Battery Storage Approved, not yet built · 150 MW
Dec 2023 6.3 km away Battery storage Holden Way Approved, not yet built · 6 MW
Jun 2018 6.3 km away Battery storage Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Nov 2022 2.0 km away Decided decided Sept 2025 20.4 km away Decided decided Aug 2014 28.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 3.5 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 7.0 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 8.1 km); Arden Quarry Landfill (landfill gas, 8.2 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.