What's changing near SK14 5RU
Within 2 km, around Cheetham Fold & Gee Cross in Tameside. Building, planning, schools, transport, prices and crime.
61new homes completed within 2 km, last 2 years
50homes given permission on brownfield sites since 2021
+1.5%like-for-like prices in Cheetham Fold & Gee Cross, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Sep 2026
Sept 2026
1.8 km away - New homes
11 new homes completedhouses · Jan 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
13 new homes completedflats · Aug 2026
Aug 2026
1.5 km away - New homes
10 new homes completedhouses · Dec 2024 – Mar 2026
Mar 2026
350 m away - Planning permissionJan 2025
1.7 km away - New homes
7 new homes completedhouses · Nov 2024
Nov 2024
1.5 km away - Planning permissionSept 2024
600 m away - Planning permissionAug 2023
1.5 km away - Planning permissionAug 2023
1.2 km away - Planning permission
30homes extended 2021–2025, typically adding 35 m²
51since energy certificates began (2008)
6in SK14 5RU itself
- Extendedcertificate 2024
- Extendedcertificate 2024
- Extendedcertificate 2023
- Extendedcertificate 2022
- Extendedcertificate 2019
- Extended
Storm overflows within 2 km
9storm overflows within 2 km
534hours of spills in 2025 between them (typical neighbourhood: about 36)
224spill events counted
- United Utilities
Meadow Lane Combined Sewer Overflowinto River Tame67 spills, 257 hours in 2025
1.9 km away - United Utilities
Raglan Street Cso 44180into River Tame58 spills, 135 hours in 2025
1.7 km away - United Utilities
Off Gibralter Lane Csointo River Tame55 spills, 61 hours in 2025
1.4 km away - United Utilities
Commercial Brow Csointo Godley Brook15 spills, 29 hours in 2025
1.9 km away - United Utilities
Manor Road Pumping Stationinto River Tame10 spills, 29 hours in 2025
1.8 km away - United Utilities
Mill Lane Combined Sewer Overflowinto River Tame1 spills, 7 hours in 2025
1.9 km away - United Utilities
Off Manor Road Cso 442jfinto River Tame6 spills, 7 hours in 2025
1.4 km away - United Utilities
Apethorn Laneinto Trib River Tame2 spills, 5 hours in 2025
650 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
49 planned, approved or being built and 10 running (65 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons Superstore, Mottram Road - Solar PanelsApproved, not yet built · 480 kW
Nov 2025
1.7 km away - Battery storage
Sheffield Road - Battery Storage SystemApproved, not yet built
Sept 2022
2.4 km away - Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024
2.8 km away - Rooftop solar
Morrisons Superstore, Saxon Street - Solar panelsApproved, not yet built · 460 kW
May 2024
3.3 km away - Battery storage
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025
3.4 km away - Battery storage
Tudor Industrial Estate, Ashton Street- Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
4.2 km away - Battery storage
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageApproved, not yet built · 40 MW
Aug 2024
4.3 km away - Battery storage
Welkin Mill, Welkin Road - Battery StorageBeing built · 50 MW
Jan 2024
4.7 km away - Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023
4.7 km away - Battery storage
Tame Box, Tame Street - Battery StorageApproved, not yet built · 200 kW
Oct 2022
4.8 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Farm Lane, HydeNew service connection · SP Electricity North West · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away - Standard
Fawley Avenue, HydeNew service connection · SP Electricity North West · Some carriageway incursion
Feb 2027 to Feb 2027
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
5.2 km away - Decideddecided Sept 2025
17.7 km away - Decideddecided Aug 2014
24.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Running nearest: Godley Water Treatment Works (solar farm, 2.3 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 2.9 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 4.2 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 4.7 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.