What's changing near SK14 3NU
Within 2 km, around Hattersley in Tameside. Building, planning, schools, transport, prices and crime.
130new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+8.5%like-for-like prices in Hattersley, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
30 new homes completedhouses · Oct 2024 – Mar 2025
Mar 2025
650 m away - New homes
8 new homes completedhouses · Oct 2024 – Mar 2025
Mar 2025
650 m away - New homes
91 new homes completedflats · Mar 2025
Mar 2025
600 m away - New schoolMay 2024
700 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 22 m²
7since energy certificates began (2008)
0in SK14 3NU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
49hours of spills in 2025 between them (typical neighbourhood: about 36)
25spill events counted
- United Utilities
Well Row Cso 442xkinto River Etherow21 spills, 31 hours in 2025
1.8 km away - United Utilities
Broadbottom Pumping Stationinto River Etherow3 spills, 16 hours in 2025
1.7 km away - United Utilities
Milverton Avenueinto Wilson Brook1 spills, 2 hours in 2025
500 m away - United Utilities
Clough End Road Cso 441ksinto Hurst Clough Brook0 spills, 0 hours in 2025
1.0 km away - United Utilities
Chain Bar Lane Csointo Hurst Clough Brook0 spills, 0 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 6 running (30 MW between them). Those within 5 km are on the map above.
- Battery storage
Sheffield Road - Battery Storage SystemApproved, not yet built
Sept 2022
2.2 km away - Rooftop solar
Morrisons Superstore, Mottram Road - Solar PanelsApproved, not yet built · 480 kW
Nov 2025
2.5 km away - Rooftop solar
Glossop Caravans, Brookfield - Solar PanelsApproved, not yet built · 230 kW
Aug 2025
3.6 km away - Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024
3.8 km away - Solar farm
Carpenter Plc, Dinting Lodge Industrial Estate - Solar ArrayApproved, not yet built · 1 MW
Mar 2025
3.9 km away - Battery storage
Tame Box, Tame Street - Battery StorageApproved, not yet built · 200 kW
Oct 2022
4.2 km away - Battery storage
Graphite Way, Hadfield - Battery Energy Storage UnitApproved, not yet built
Aug 2023
4.3 km away - Landfill gas
Tame Power - Flexible Energy FacilityApproved, not yet built · 5 MW
Dec 2024
4.5 km away - Battery storage
Holden WayApproved, not yet built · 6 MW
Jun 2018
4.7 km away - Battery storage
Tudor Industrial Estate, Ashton Street- Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
5.0 km away - Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
2.4 km away - Decideddecided Sept 2025
18.7 km away - Decideddecided Aug 2014
26.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 1.7 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 5.6 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 6.4 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 7.5 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.