Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
766hours of spills in 2025 between them (typical neighbourhood: about 36)
318spill events counted
United Utilities
Hyde Wastewater Treatment Worksinto River Tame69 spills, 293 hours in 2025
1.5 km away
United Utilities
Raglan Street Cso 44180into River Tame58 spills, 135 hours in 2025
1.1 km away
United Utilities
Hyde Wastewater Treatment Worksinto River Tame18 spills, 112 hours in 2025
1.5 km away
United Utilities
Hyde Road (Denton) Csointo River Tame40 spills, 50 hours in 2025
1.5 km away
United Utilities
Commercial Brow Csointo Wilson Brook44 spills, 45 hours in 2025
350 m away
United Utilities
Edward Street Csointo Trib Of River Tame Via Sws27 spills, 38 hours in 2025
1.9 km away
United Utilities
Cheetham Hill Road Csointo Johnson Brook24 spills, 32 hours in 2025
1.3 km away
United Utilities
Commercial Brow Csointo Godley Brook15 spills, 29 hours in 2025
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Hyde North: +35% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.