What's changing near SK1 3BW
Within 2 km, around Heaviley in Stockport. Building, planning, schools, transport, prices and crime.
838new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.0%like-for-like prices in Heaviley, 2024 → 2025 (council +4.2%)
–crime data not published here (Greater Manchester)
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Aug 2026 – Sep 2026
Sept 2026
1.8 km away - New homes
12 new homes completedflats · Aug 2026
Aug 2026
500 m away - New homes
73 new homes completedflats · Jul 2026
Jul 2026
950 m away - New homes
5 new homes completedflats · Jul 2026
Jul 2026
1.1 km away - New homes
5 new homes completedflats · May 2026
May 2026
600 m away - New homes
7 new homes completedflats · Mar 2026
Mar 2026
400 m away - New homes
53 new homes completedflats · Feb 2025 – Jan 2026
Jan 2026
400 m away - New homes
6 new homes completedflats · Oct 2025
Oct 2025
1.8 km away - New homes
9 new homes completedflats · Aug 2025
Aug 2025
1.0 km away - New homes
66 new homes completedflats · May 2025 – Jul 2025
Jul 2025
400 m away - New homes
65 new homes completedflats · Jul 2025
Jul 2025
400 m away - New homes
96 new homes completedflats · Jun 2025
Jun 2025
1.8 km away - New homes
12 new homes completed
14homes extended 2021–2025, typically adding 28 m²
26since energy certificates began (2008)
2in SK1 3BW itself
- Extendedcertificate 2024
- Extendedcertificate 2019
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
21storm overflows within 2 km
850hours of spills in 2025 between them (typical neighbourhood: about 36)
404spill events counted
- United Utilities
Hope Street Combined Sewer Overflowinto River Mersey84 spills, 184 hours in 2025
1.2 km away - United Utilities
Penny Lane Grimesbottom Cso 43122into River Tame35 spills, 138 hours in 2025
1.2 km away - United Utilities
Wellington Road South Csointo River Mersey50 spills, 115 hours in 2025
750 m away - United Utilities
Princes Street Csointo River Mersey54 spills, 114 hours in 2025
700 m away - United Utilities
Travis Brow/Georges Road Csointo River Mersey56 spills, 86 hours in 2025
1.4 km away - United Utilities
Great Underbank Cso 43200 Stk0039into Clvrt Section Of River Mersey39 spills, 75 hours in 2025
650 m away - United Utilities
Newbridge Lane Csointo River Goyt2 spills, 28 hours in 2025
1.1 km away - United Utilities
Avenue St Brewery St Csointo River Goyt11 spills, 26 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
66 planned, approved or being built and 12 running (117 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Rrg Toyota, St Marys Way - Solar PanelsApproved, not yet built · 190 kW
Mar 2025
300 m away - Rooftop solar
Life Leisure Grand Central, Grand Central Square - Solar PanelsApproved, not yet built · 180 kW
Dec 2022
600 m away - Rooftop solar
Decathlon, Georges Road - Solar Pv SystemApproved, not yet built · 150 kW
Apr 2024
1.2 km away - Battery storage
Bredbury Substation - Battery Storage FacilityBeing built · 50 MW
Mar 2023
1.4 km away - Battery storage
Welkin Mill, Welkin Road - Battery StorageBeing built · 50 MW
Jan 2024
1.5 km away - Rooftop solar
Heaton Norris - Solar PV PanelApproved, not yet built · 200 kW
Aug 2022
1.5 km away - Rooftop solar
A G Parfett and Son, Didsbury Road - Solar PanelsApproved, not yet built · 270 kW
May 2023
1.7 km away - Rooftop solar
Mercedes Benz, Heaton Mersey - Solar PanelsApproved, not yet built · 200 kW
Jul 2023
2.0 km away - Battery storage
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageApproved, not yet built · 40 MW
Aug 2024
2.3 km away - Rooftop solar
Bird Hall Lane, Cheadle Heath - Solar PanelsApproved, not yet built · 510 kW
Mar 2026
2.5 km away
Road and street works within 1 km
12 permitted works running now or planned, 6 of them major.
- Major, planned
Norbury Street, StockportUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Oct 2026 to Nov 2026
500 m away - Major
Norbury Street, StockportUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Oct 2026 to Nov 2026
500 m away - Major
Wellington Road South, StockportRemedial works · United Utilities Water Ltd · Lane closure
Oct 2026 to Nov 2026
550 m away - Major, planned
Greek Street, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026
700 m away - Major
Greek Street, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026
700 m away - Major
Royal George Street, StockportHighway improvement works · STOCKPORT METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026
700 m away - Standard
Tatton Street, StockportNew service connection · SP Electricity North West · Some carriageway incursion
Nov 2026 to Nov 2026
500 m away - Standard
St Petersgate, StockportNew service connection · SP Electricity North West · Some carriageway incursion
Nov 2026 to Nov 2026
500 m away - Standard
Thomson Street, StockportUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
11.3 km away - Decideddecided Sept 2025
17.4 km away - Decideddecided Aug 2014
18.1 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
27.1 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
28.1 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Welkin Road, Bredbury - Battery Storage System (battery storage, 1.4 km); Audi Stockport, Brinksway, Edgeley - Solar Panels (rooftop solar, 1.5 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.3 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 4.8 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.