Country England and Wales › Region East Midlands › Council High Peak › Neighbourhood Hadfield West & Gamesley › Postcode SK13 1PJ What's changing near SK13 1PJ Within 2 km, around Hadfield West & Gamesley in High Peak. Building, planning, schools, transport, prices and crime.
37 new homes completed within 2 km, last 2 years
279 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Hadfield West & Gamesley, 2024 → 2025 (council +5.4%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
4 homes extended 2021–2025, typically adding 20 m²
10 since energy certificates began (2008)
0 in SK13 1PJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 17 storm overflows within 2 km
3,947 hours of spills in 2025 between them (typical neighbourhood: about 36)
673 spill events counted
United Utilities Glossop Stw into Trib River Etherow 102 spills, 1,411 hours in 2025
1.5 km away United Utilities Tbc into River Etherow 58 spills, 534 hours in 2025
1.5 km away United Utilities Melandra Road Pumping Station into Glossop Brook 87 spills, 444 hours in 2025
1000 m away United Utilities Woodlands Close Cso (21117) into River Etherow 82 spills, 342 hours in 2025
850 m away United Utilities Spring Tavern Cso 218nh into River Etherow 68 spills, 283 hours in 2025
800 m away United Utilities High St West Cso (21120) into Glossop Brook 36 spills, 231 hours in 2025
2.0 km away United Utilities High Street West Cso (Aka Dinting Lane Cso) into Glossop Brook 50 spills, 217 hours in 2025
1.9 km away United Utilities Whoolley Lane Cso 44024 into River Etherow 56 spills, 128 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 16 planned, approved or being built and 3 running (8 MW between them). Those within 5 km are on the map above.
Battery storage Graphite Way, Hadfield - Battery Energy Storage Unit Approved, not yet built
Aug 2023 400 m away Rooftop solar Glossop Caravans, Brookfield - Solar Panels Approved, not yet built · 230 kW
Aug 2025 950 m away Solar farm Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array Approved, not yet built · 1 MW
Mar 2025 1.2 km away Battery storage Printworks Road - Stalybridge Battery Storage Approved, not yet built · 150 MW
Dec 2023 5.7 km away Battery storage Sheffield Road - Battery Storage System Approved, not yet built
Sept 2022 5.9 km away Battery storage Tame Box, Tame Street - Battery Storage Approved, not yet built · 200 kW
Oct 2022 6.5 km away Rooftop solar Morrisons Superstore, Mottram Road - Solar Panels Approved, not yet built · 480 kW
Nov 2025 6.5 km away Landfill gas Tame Power - Flexible Energy Facility Approved, not yet built · 5 MW
Dec 2024 6.7 km away Battery storage Holden Way Approved, not yet built · 6 MW
Jun 2018 7.0 km away Rooftop solar Tameside General Hospital, Fountain Street - Solar Panels Planning application in · 310 kW
Jun 2026 7.1 km away Other Road and street works within 1 km 5 permitted works running now or planned, 1 of them major.
Major Station Road, Glossop Highway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away Standard Watkin Avenue, Glossop New service connection · SP Electricity North West · Give and take
Oct 2026 to Oct 2026 450 m away Minor Hadfield Road, Glossop Optional permit (no fee) e.g. for traffic management etc · DERBYSHIRE COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026 300 m away Minor Hadfield Road, Glossop Optional permit (no fee) e.g. for traffic management etc · DERBYSHIRE COUNTY COUNCIL · Stop/go boards
Nov 2026 to Nov 2026 550 m away Minor The Croft, Glossop Utility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Oct 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Nov 2022 1.8 km away Decided decided Sept 2025 21.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 5.4 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 9.8 km); Arden Quarry Landfill (landfill gas, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.