Country England and Wales › Region East of England › Council North Hertfordshire › Neighbourhood Baldock › Postcode SG7 6JF What's changing near SG7 6JF Within 2 km, around Baldock in North Hertfordshire. Building, planning, schools, transport, prices and crime.
73 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.4% like-for-like prices in Baldock, 2024 → 2025 (council +2.1%)
-11% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 24 m²
11 since energy certificates began (2008)
0 in SG7 6JF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
3 hours of spills in 2025 between them (typical neighbourhood: about 36)
2 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 7 running (41 MW between them). Those within 5 km are on the map above.
Battery storage Letchworth Garden City - Urban Reserve Energy Storage Facility Approved, not yet built · 5 MW
Apr 2024 1.4 km away Rooftop solar Chesfield Downs Golf Club, Jacks Hill - Solar panels Approved, not yet built · 200 kW
Oct 2023 3.6 km away Battery storage Newnham Road, Newnham - Battery Energy Storage Approved, not yet built
Jun 2025 3.9 km away Solar farm Tophams Solar Farm Approved, not yet built · 40 MW
Jun 2024 4.0 km away Battery storage Tophams Solar Farm Approved, not yet built · 8 MW
Jun 2024 4.0 km away Battery storage Westfield Conservation Park - Battery Energy Storage System Planning application in · 99 MW
Aug 2025 4.5 km away Solar farm Wymondley Solar Farm, Great Wymondley Approved, not yet built · 50 MW
Mar 2024 5.4 km away Battery storage Wymondley Solar Farm, Great Wymondley Approved, not yet built
Mar 2024 5.4 km away Rooftop solar Sainsburys, Hitchin Road - Solar Panels Approved, not yet built · 310 kW
Mar 2025 7.0 km away Battery storage Stevenage Road, Titmore Green - Battery Energy Storage System Planning application in · 57 MW
May 2025 7.1 km away Battery storage Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major South Road, Baldock Highway improvement works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Feb 2027 750 m away Major Norton Road, Baldock Highway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 17.1 km away Decided decided Oct 2013 20.5 km away Decided decided Sept 2014 22.4 km away Decided decided Oct 2011 23.8 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 24.1 km away Decided decided Aug 2022 27.0 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD) (anaerobic digestion, 4.1 km); Arlesey Landfill Gas (Extension) (landfill gas, 5.9 km); Arlesey Landfill Site (landfill gas, 6.2 km); Hitchin (landfill gas, 7.3 km); Langford Solar Farm (solar farm, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.