Country England and Wales › Region East of England › Council Central Bedfordshire › Neighbourhood Stotfold › Postcode SG5 4NF What's changing near SG5 4NF Within 2 km, around Stotfold in Central Bedfordshire. Building, planning, schools, transport, prices and crime.
89 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.5% like-for-like prices in Stotfold, 2024 → 2025 (council +3.0%)
+7% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 30 new homes completed 1 flats, 29 houses · Jun 2025 – Oct 2026
planned Oct 2026 1.8 km away New homes 27 new homes completed 4 flats, 23 houses · Nov 2024 – Oct 2026
planned Oct 2026 1.8 km away New homes 17 new homes completed 1 flats, 16 houses · Nov 2024 – Sep 2026
Sept 2026 1.8 km away New homes 8 new homes completed flats · Feb 2026
Feb 2026 700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
16 homes extended 2021–2025, typically adding 32 m²
28 since energy certificates began (2008)
1 in SG5 4NF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
12 hours of spills in 2025 between them (typical neighbourhood: about 36)
3 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 14 planned, approved or being built and 6 running (40 MW between them). Those within 5 km are on the map above.
Battery storage Newnham Road, Newnham - Battery Energy Storage Approved, not yet built
Jun 2025 2.7 km away Battery storage Letchworth Garden City - Urban Reserve Energy Storage Facility Approved, not yet built · 5 MW
Apr 2024 3.5 km away Solar farm Tophams Solar Farm Approved, not yet built · 40 MW
Jun 2024 4.3 km away Battery storage Tophams Solar Farm Approved, not yet built · 8 MW
Jun 2024 4.3 km away Rooftop solar Aco Technologies Plc, Hitchin Road - Solar Panels Approved, not yet built · 250 kW
Dec 2025 6.1 km away Battery storage Dunton Lane - Battery Energy Storage System Approved, not yet built · 200 MW
Jul 2025 6.7 km away Rooftop solar Stratton Business Park, Pegasus Drive - Solar Panels Approved, not yet built
May 2024 6.8 km away Rooftop solar Chesfield Downs Golf Club, Jacks Hill - Solar panels Approved, not yet built · 200 kW
Oct 2023 7.3 km away Battery storage Dunton Lane - Battery Energy Storage System Approved, not yet built · 177 MW
Oct 2025 7.4 km away Solar farm Wymondley Solar Farm, Great Wymondley Approved, not yet built · 50 MW
Mar 2024 8.1 km away Battery storage Road and street works within 1 km 5 permitted works running now or planned, 4 of them major.
Major, planned Stotfold Bypass, Stotfold Works for road purposes · CENTRAL BEDFORDSHIRE COUNCIL · No carriageway incursion
Oct 2026 to Oct 2031 450 m away Major Stotfold Bypass, Stotfold Works for road purposes · CENTRAL BEDFORDSHIRE COUNCIL · No carriageway incursion
Oct 2026 to Oct 2031 450 m away Major, planned Hitchin Road, Stotfold Highway repair and maintenance works · CENTRAL BEDFORDSHIRE COUNCIL · Road closure
Dec 2026 to Dec 2026 1000 m away Major Hitchin Road, Stotfold Highway repair and maintenance works · CENTRAL BEDFORDSHIRE COUNCIL · Road closure
Dec 2026 to Dec 2026 1000 m away Minor Brayes Manor, Stotfold Highway repair and maintenance works · CENTRAL BEDFORDSHIRE COUNCIL · Give and take
Oct 2026 to Oct 2026 350 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 18.5 km away Decided decided Oct 2011 20.7 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 21.0 km away Decided decided Oct 2013 21.7 km away Decided decided Sept 2014 22.1 km away Decided decided Aug 2022 23.4 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Arlesey Landfill Gas (Extension) (landfill gas, 3.4 km); Langford Solar Farm (solar farm, 3.5 km); Arlesey Landfill Site (landfill gas, 3.9 km); Langford Wind Farm (wind farm, 5.2 km); Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD) (anaerobic digestion, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.