Country England and Wales › Region East of England › Council North Hertfordshire › Neighbourhood Hitchin Town & West › Postcode SG5 2NZ What's changing near SG5 2NZ Within 2 km, around Hitchin Town & West in North Hertfordshire. Building, planning, schools, transport, prices and crime.
110 new homes completed within 2 km, last 2 years
10 homes given permission on brownfield sites since 2021
-0.0% like-for-like prices in Hitchin Town & West, 2024 → 2025 (council +2.1%)
+3% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed flats · Mar 2026
Mar 2026 1.1 km away New homes 8 new homes completed houses · Dec 2025 – Jan 2026
Jan 2026 1.6 km away New homes 27 new homes completed houses · Oct 2024 – Mar 2025
Mar 2025 1.1 km away New homes 11 new homes completed flats · Jan 2025
Jan 2025 250 m away New homes 11 new homes completed flats · Jan 2025
Jan 2025 250 m away New homes 12 new homes completed flats · Nov 2024
Nov 2024 300 m away New homes 12 new homes completed flats · Nov 2024
Nov 2024 300 m away New homes 8 new homes completed flats · Oct 2024
Oct 2024 1.5 km away Planning permission Permission for 10 homes Kwik -Fit Tyres, 59 -61 Walsworth Road, Hitcin (full planning permission)
Dec 2022 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 67 m²
11 since energy certificates began (2008)
0 in SG5 2NZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
26 hours of spills in 2025 between them (typical neighbourhood: about 36)
16 spill events counted
Anglian Water Hitchin Water Recycling Centre into River Hiz 13 spills, 26 hours in 2025
1.7 km away Anglian Water Hitchin Water Recycling Centre into River Hiz 3 spills, 1 hours in 2025
1.7 km away Anglian Water Bancroft Recreation Ground Cso into River Hiz 0 spills, 0 hours in 2025
1.3 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 25 planned, approved or being built and 5 running (19 MW between them). Those within 5 km are on the map above.
Solar farm Wymondley Solar Farm, Great Wymondley Approved, not yet built · 50 MW
Mar 2024 4.1 km away Battery storage Wymondley Solar Farm, Great Wymondley Approved, not yet built
Mar 2024 4.1 km away Solar farm St Ippolyts - Solar Farm & Battery Storage Approved, not yet built · 25 MW
Jul 2025 4.8 km away Battery storage St Ippolyts - Solar Farm & Battery Storage Approved, not yet built · 13 MW
Jul 2025 4.8 km away Battery storage Stevenage Road, Titmore Green - Battery Energy Storage System Planning application in · 57 MW
May 2025 5.0 km away Rooftop solar Chesfield Downs Golf Club, Jacks Hill - Solar panels Approved, not yet built · 200 kW
Oct 2023 6.1 km away Battery storage Letchworth Garden City - Urban Reserve Energy Storage Facility Approved, not yet built · 5 MW
Apr 2024 6.3 km away Rooftop solar Sainsburys, Hitchin Road - Solar Panels Approved, not yet built · 310 kW
Mar 2025 6.6 km away Battery storage Martins Way - Micro Energy Storage Approved, not yet built · 200 kW
Jun 2026 7.1 km away Rooftop solar Aco Technologies Plc, Hitchin Road - Solar Panels Approved, not yet built · 250 kW
Dec 2025 7.3 km away Road and street works within 1 km 11 permitted works running now or planned, 5 of them major.
Major, planned Swinburne Avenue, Hitchin Highway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 550 m away Major, planned Deacons Way, Hitchin Highway improvement works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 600 m away Major Deacons Way, Hitchin Highway improvement works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 600 m away Major, planned Lancaster Avenue, Hitchin Utility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026 950 m away Major, planned York Road, Hitchin Utility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026 950 m away Standard North Place, Hitchin Highway improvement works · HERTFORDSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 100 m away Standard Oughton Head Way, Hitchin Utility asset works · CADENT GAS LIMITED · Multi-way signals
Jan 2027 to Jan 2027 750 m away Standard Grays Lane, Hitchin Disconnection or alteration of supply · CADENT GAS LIMITED · Give and take
Oct 2026 to Oct 2026 900 m away Minor Fishponds Road, Hitchin Utility repair and maintenance works · ANGLIAN WATER · Two-way signals
Jan 2027 to Jan 2027 750 m away Minor Major infrastructure projects within 30 km Decided decided Apr 2025 10.6 km away Decided decided Oct 2013 13.7 km away Decided decided Sept 2014 15.1 km away Decided decided Oct 2011 19.2 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 19.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hitchin (landfill gas, 2.3 km); Arlesey Landfill Site (landfill gas, 5.2 km); Arlesey Landfill Gas (Extension) (landfill gas, 5.4 km); Flamingo House (rooftop solar, 7.7 km); Langford Solar Farm (solar farm, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.