What's changing near SE20 7YG
Within 2 km, around Anerley South in Bromley. Building, planning, schools, transport, prices and crime.
153new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.2%like-for-like prices in Anerley South, 2024 → 2025 (council +1.6%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Jan 2025 – Sep 2026
Sept 2026
1.2 km away - New homes
38 new homes completedflats · Jun 2026
Jun 2026
1.1 km away - School closed
School closed: Kings LondonOther independent school, other independent school (closure)
Mar 2026
1.6 km away - New homes
5 new homes completedhouses · Jul 2025 – Mar 2026
Mar 2026
450 m away - New homes
9 new homes completedhouses · Mar 2026
Mar 2026
650 m away - New homes
5 new homes completedflats · Jan 2026
Jan 2026
1.1 km away - New homes
20 new homes completedflats · Jan 2026
Jan 2026
2.0 km away - New homes
9 new homes completedhouses · Oct 2025
Oct 2025
1.4 km away - New homes
9 new homes completedflats · May 2025
May 2025
1.0 km away - New schoolApr 2025
1.2 km away - New homes
5 new homes completedflats · Mar 2025
Mar 2025
800 m away - New homes
6 new homes completed
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
9net new homes in approved schemes since 2023
- Application Under Consideration
111, Elmers End Road, BR3 4SYDetails submitted to comply with the requirements of the following conditions relating to planning permission ref: 21/05673/FULL1 (allowed at appeal ref no APP/G5180/W/22/3298393) Condition 6: Parking area ground levels and surfacing materialsBromley 21/05673/CONDIT · All Other
Jun 2025
300 m away - Application Under Consideration
17, Thornsett Road, SE20 7XBUse of single storey side extension as short-term rental studio/holiday-let. (Retrospective).Bromley 25/01247/FULL1 · All Other
May 2025
300 m away - Approved
8, Stembridge Road, SE20 7UFSingle storey rear/side wrap around extension.Bromley 25/01361/FULL6 · Householder
May 2025
300 m away - Application Under Consideration
113, Croydon Road, SE20 7TTConversion of a three unit property into a six unit property through extensions to the rear, creation of a basement and alteration of the roof form and addition of front and rear dormers.Bromley 25/00896/FULL1 · All Other · 7 homes proposed
May 2025
400 m away - Refused
77B, Marlow Road, SE20 7XRConversion of existing office (Class E) at ground floor front of property to 1 no. additional bedroom to enlarge existing studio flat, under Class MA, Part 3, Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impacts, characteBromley 25/01591/CUETC3 · All Other
Apr 2025
50 m away - Closed
67A, Cambridge Road, SE20 7XJ
33homes extended 2021–2025, typically adding 32 m²
65since energy certificates began (2008)
1in SE20 7YG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 2 running (61 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Croydon Road - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
1.2 km away - Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
1.6 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
2.0 km away - Rooftop solar
Selhurst Traincare Depot, Selhurst Road - Solar PanelsApproved, not yet built · 1 MW
Nov 2025
2.3 km away - Rooftop solar
Trinity School Of John Whitgift, Shirley Road - Solar PanelsApproved, not yet built
Apr 2023
2.5 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Aug 2022
3.3 km away - Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
3.4 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar PanelsPlanning application in
May 2026
3.6 km away - Rooftop solar
Knights Hill - Solar PV equipmentApproved, not yet built · 180 kW
Sept 2023
4.0 km away - Rooftop solar
Dulwich College, College Road - Solar panelsApproved, not yet built · 660 kW
Dec 2024
4.2 km away
Road and street works within 1 km
7 permitted works running now or planned, 1 of them major.
- Major, planned
Harrington Road, LondonUtility asset works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026
800 m away - Standard
Elmers End Road, PengeNew service connection · SOUTHERN GAS NETWORKS PLC · Two-way signals
Jan 2027 to Jan 2027
250 m away - Standard
Harrington Road, LondonUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away - Standard
Regina Road, LondonNew service connection · UK POWER NETWORKS SOUTH EASTERN · No carriageway incursion
Nov 2026 to Nov 2026
850 m away - Minor
Albert Road, LondonUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
900 m away - Minor
Maple Road, PengeUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
900 m away - Immediate - urgent
Penge Road, CroydonWorks for Rail Purposes · NETWORK RAIL · No carriageway incursion
Sept 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
9.9 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
11.9 km away - Decideddecided Sept 2014
12.2 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
18.5 km away - Decideddecided Nov 2025
18.8 km away - Pre-applicationapplication due March 2027
20.2 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
9.7 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
10.1 km away - TransportMay 2022
14.7 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
17.6 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
18.8 km away
Running nearest: Beddington EfW (energy from waste, 6.6 km); SELCHP ERF (energy from waste, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.