Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
1,428hours of spills in 2025 between them (typical neighbourhood: about 36)
205spill events counted
Yorkshire Water
Blackburn Meadows Wastewater Worksinto River Don62 spills, 990 hours in 2025
800 m away
Yorkshire Water
Blackburn Meadows Wastewater Worksinto River Don21 spills, 202 hours in 2025
900 m away
Yorkshire Water
Town Street Sheffield Csointo Don32 spills, 78 hours in 2025
350 m away
Yorkshire Water
Town Street Sheffield Csointo Don27 spills, 53 hours in 2025
350 m away
Yorkshire Water
Town Street Sheffield Csointo Don17 spills, 27 hours in 2025
350 m away
Yorkshire Water
Town Street Sheffield Csointo Don13 spills, 20 hours in 2025
350 m away
Yorkshire Water
Fife Street Csointo Blackburn Brook4 spills, 19 hours in 2025
1.6 km away
Yorkshire Water
Jordan Csointo Holmes Goit11 spills, 16 hours in 2025
55 planned, approved or being built and 11 running (184 MW between them). Those within 5 km are on the map above.
Energy from waste
Former Templeborough Steel WorksApproved, not yet built · 23 MW
Oct 2016 400 m away
Battery storage
Magna Way, Templeborough - Battery Energy Storage FacilityApproved, not yet built
Jun 2022 900 m away
Rooftop solar
Meadowhall Centre, Meadowhall Way - Solar PanelsApproved, not yet built · 390 kW
Oct 2025 1.2 km away
Rooftop solar
Clipper Logistics, Shepcote Lane - Solar PanelsApproved, not yet built · 1 MW
Jan 2023 1.4 km away
Rooftop solar
Shepcote Lane - Solar Photovoltaic PanelsApproved, not yet built · 4 MW
Aug 2023 1.4 km away
Rooftop solar
Taj Foods, Roman Ridge Road - Solar PanelsApproved, not yet built · 390 kW
Jun 2025 1.5 km away
Rooftop solar
Ickles Works, Templeborough - Solar PhotovoltaicsApproved, not yet built · 530 kW
Sept 2022 1.5 km away
Rooftop solar
The Food Warehouse, Meadowhall Retail Park - Solar PanelsApproved, not yet built · 160 kW
Feb 2026 1.7 km away
Rooftop solar
Vodafone Telephone Exchange, Europa Drive - Solar PanelsApproved, not yet built · 270 kW
Mar 2023 1.8 km away
Rooftop solar
Jessops Riverside, Brightside Lane - Solar PanelsApproved, not yet built · 390 kW
Mar 2024 1.9 km away
Road and street works within 1 km
2 permitted works running now or planned.
Minor
Meadowhall Way, SheffieldUtility asset works · VODAFONE GROUP · Lane closure
Oct 2026 to Oct 2026 800 m away
Minor
Meadowhall Way, SheffieldUtility asset works · VODAFONE GROUP · Lane closure
Oct 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tinsley & Carbrook: +30% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.