Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
209hours of spills in 2025 between them (typical neighbourhood: about 36)
55spill events counted
Yorkshire Water
Ravenfield Village Stwinto Trib Of Hooton Brook34 spills, 106 hours in 2025
47 planned, approved or being built and 9 running (160 MW between them). Those within 5 km are on the map above.
Rooftop solar
Pearsons Assessment And Testing, Hellaby Ind Estate - Solar PanelsApproved, not yet built · 170 kW
Jan 2023 2.4 km away
Solar farm
Mere Flats Solar FarmApproved, not yet built · 56 MW
May 2023 2.6 km away
Battery storage
Mere Flats Solar FarmPlanning application in · 16 MW
Aug 2022 2.6 km away
Solar farm
Firsby Lane, Hooton Roberts - Solar PanelsPlanning application in · 14 MW
May 2026 3.0 km away
Solar farm
Moat Barn, Moat Lane - Solar PanelsApproved, not yet built
Jun 2025 3.4 km away
Battery storage
Moat Lane, Wickersley - Battery Storage FacilityApproved, not yet built · 100 MW
Nov 2025 3.6 km away
Battery storage
Moat Lane, Wickersley - Battery Storage FacilityApproved, not yet built · 100 MW
Nov 2025 3.7 km away
Solar farm
Thurcroft Interchange Energy Park - Solar FarmPlanning application in · 50 MW
Jun 2025 4.0 km away
Battery storage
Thurcroft Interchange Energy Park - Battery Energy Storage SystemPlanning application in · 50 MW
Jun 2025 4.0 km away
Battery storage
Thurcroft Battery Storage, Green Lane - Battery Energy Storage SystemApproved, not yet built
Jan 2026 4.1 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 25.4 km away
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.