Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
771hours of spills in 2025 between them (typical neighbourhood: about 36)
136spill events counted
Yorkshire Water
Aldwarke Wwtwinto River Don39 spills, 316 hours in 2025
1.9 km away
Yorkshire Water
Hooton Roberts Stwinto Hooton Brook25 spills, 140 hours in 2025
1.9 km away
Yorkshire Water
Ravenfield Village Stwinto Trib Of Hooton Brook34 spills, 106 hours in 2025
1.7 km away
Yorkshire Water
Rawmarsh No 2 Csointo Roundwood Brook12 spills, 91 hours in 2025
2.0 km away
Yorkshire Water
Dalton Brook Csointo Dalton Brook16 spills, 78 hours in 2025
1.5 km away
Yorkshire Water
Fosters Garage Spsinto Tributary Of The River Don10 spills, 40 hours in 2025
350 m away
Yorkshire Water
Dalton Lane Csointo Dalton Brook0 spills, 0 hours in 2025
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 29.3 km away
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.