Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
278hours of spills in 2025 between them (typical neighbourhood: about 36)
104spill events counted
Yorkshire Water
Lime Grove Csointo Clvrt Trib Of Kilnhurst Cut35 spills, 111 hours in 2025
1.7 km away
Yorkshire Water
Carlisle Street Csointo Sheff & South Yorks Nav Canal27 spills, 84 hours in 2025
1.7 km away
Yorkshire Water
Yorkshire Water Services Ltdinto Brook Dike17 spills, 67 hours in 2025
48 planned, approved or being built and 10 running (105 MW between them). Those within 5 km are on the map above.
Rooftop solar
Bluetree Group, Brookfields Park - Solar PanelsPlanning application in
Oct 2022 2.0 km away
Rooftop solar
Bluetree Group, Brookfields Park - Solar Photovoltaics EquipmentApproved, not yet built
Dec 2022 2.1 km away
Rooftop solar
Brookfields Park, Brookfields Drive - Solar PV PanelsApproved, not yet built · 1 MW
Jun 2024 2.2 km away
Rooftop solar
Brookfields Park, Brookfields Drive - Solar PV PanelsApproved, not yet built · 1 MW
Jun 2024 2.2 km away
Rooftop solar
Meadows Road, Manvers - Solar ArrayPlanning application in · 2 MW
Feb 2022 2.6 km away
Rooftop solar
Bauer Equipment, Rotary Drive - Solar PanelsPlanning application in
Jul 2023 3.5 km away
Battery storage
West Melton Electricity Substation - Energy Storage SystemApproved, not yet built · 26 MW
Sept 2022 3.7 km away
Battery storage
Swangate Project - Energy Storage SystemApproved, not yet built · 50 MW
Sept 2017 3.8 km away
Rooftop solar
Eland House, Denaby - Solar PanelsPlanning application in · 330 kW
Apr 2022 4.4 km away
Rooftop solar
Morrisons Supermarkets, Corton Wood - Solar PanelsApproved, not yet built · 380 kW
Mar 2025 4.6 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major, planned
Grange Road, RotherhamWorks for road purposes · ROTHERHAM METROPOLITAN BOROUGH COUNCIL · Road closure
Nov 2026 to Nov 2026 500 m away
Major
Chapel Hill, RotherhamHighway repair and maintenance works · ROTHERHAM METROPOLITAN BOROUGH COUNCIL · Road closure
Sept 2026 to Mar 2027 750 m away
Standard
Pinfold Close, RotherhamDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Oct 2026 to Oct 2026 750 m away
Minor
Warren Vale Road Service Road, RotherhamUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 25.7 km away
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Swinton North: +42% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.3% in two years.
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 28.4 km away
Examination
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
application due in February 2026 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.