What's changing near S64 0NG
Within 2 km, around Mexborough East in Doncaster. Building, planning, schools, transport, prices and crime.
22new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.3%like-for-like prices in Mexborough East, 2024 → 2025 (council +3.7%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Jun 2026
Jun 2026
1.6 km away - New homes
8 new homes completedhouses · Mar 2026
Mar 2026
1.6 km away - School closed
School closed: Fullerton House SchoolOther independent special school, other independent special school (closure)
Jul 2022
1.2 km away - School closed
School closed: Hillside AcademyAcademy sponsor led, primary (closure)
Aug 2021
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 42 m²
4since energy certificates began (2008)
0in S64 0NG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
973hours of spills in 2025 between them (typical neighbourhood: about 36)
199spill events counted
- Yorkshire Water
Permit Applied Forinto Permit Applied For23 spills, 218 hours in 2025
1.2 km away - Yorkshire Water
Britain Street Csointo River Don Via Public Sewer41 spills, 143 hours in 2025
1.9 km away - Yorkshire Water
Denaby No 2 Stwinto River Don32 spills, 134 hours in 2025
450 m away - Yorkshire Water
Harlington Mill Lane Csointo Culv Trib Of Old River Dearne16 spills, 125 hours in 2025
1.9 km away - Yorkshire Water
Ferryboat Lane Sewage Pumping Stninto Unnamed Trib Of River Don13 spills, 97 hours in 2025
1.5 km away - Yorkshire Water
Swinton Road Csointo River Don Via Pubic Sewer25 spills, 76 hours in 2025
1.9 km away - Yorkshire Water
Pastures Road Spsinto Tributary Of The River Dearne9 spills, 52 hours in 2025
350 m away - Yorkshire Water
Yws Unknown Sites Defaultinto Unknown7 spills, 50 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
42 planned, approved or being built and 7 running (27 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Eland House, Denaby - Solar PanelsPlanning application in · 330 kW
Apr 2022
1.3 km away - Rooftop solar
De Warenne Academy, Gardens Lane - Solar panelsApproved, not yet built · 240 kW
Dec 2025
2.0 km away - Rooftop solar
Red House Farm, High Melton -Solar PanelsApproved, not yet built · 160 kW
Sept 2022
2.4 km away - Rooftop solar
Red House Farm, High Melton - Red House Solar PanelsApproved, not yet built · 150 kW
Sept 2021
2.5 km away - Solar farm
Doncaster Road, Doncaster Road - Solar ArrayApproved, not yet built · 1 MW
Jun 2023
2.5 km away - Solar farm
Firsby Lane, Hooton Roberts - Solar PanelsPlanning application in · 14 MW
May 2026
3.5 km away - Rooftop solar
Bluetree Group, Brookfields Park - Solar PanelsPlanning application in
Oct 2022
4.0 km away - Rooftop solar
Brookfields Park, Brookfields Drive - Solar PV PanelsApproved, not yet built · 1 MW
Jun 2024
4.2 km away - Rooftop solar
Brookfields Park, Brookfields Drive - Solar PV PanelsApproved, not yet built · 1 MW
Jun 2024
4.2 km away - Rooftop solar
Meadows Road, Manvers - Solar ArrayPlanning application in · 2 MW
Feb 2022
5.0 km away
Road and street works within 1 km
5 permitted works running now or planned, 3 of them major.
- Major
Old Doncaster Road, DoncasterWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major
Pastures Road, DoncasterOptional permit (no fee) e.g. for traffic management etc · DONCASTER METROPOLITAN BOROUGH COUNCIL · Two-way signals
Nov 2026 to Nov 2026
700 m away - Major
Bolton Street, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away - Standard
Pastures Road, DoncasterNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Oct 2026 to Oct 2026
50 m away - Minor
Denaby Lane, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Two-way signals
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
13.0 km away - Decideddecided Oct 2012
13.6 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
19.5 km away - Decideddecided Mar 2016
22.4 km away - Decideddecided Mar 2015
23.5 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
24.4 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) (anaerobic digestion, 4.0 km); Marr Windfarm (wind farm, 4.2 km); Thrybergh Hydroelectric Scheme (battery storage, 4.8 km); Goldthorpe (rooftop solar, 5.3 km); Hampole Wind Farm (wind farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.