Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
21storm overflows within 2 km
3,562hours of spills in 2025 between them (typical neighbourhood: about 36)
486spill events counted
Yorkshire Water
Rotherham Erskine Road Spsinto River Don107 spills, 1,507 hours in 2025
1.3 km away
Yorkshire Water
Blackburn Meadows Wastewater Worksinto River Don62 spills, 990 hours in 2025
Westgate, RotherhamDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Nov 2026 to Nov 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Masbrough & Bradgate: +35% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.1% in two years.