Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
387hours of spills in 2025 between them (typical neighbourhood: about 36)
118spill events counted
Yorkshire Water
Herries Road No 2 Csointo Todd Hole Dike/Mill Stream71 spills, 264 hours in 2025
2.0 km away
Yorkshire Water
Deerlands Avenue 178 No 2 Csointo Sheffield Lane Dike41 spills, 121 hours in 2025
1.7 km away
Yorkshire Water
Barnsley Road Csointo Sheffield Lane Dike3 spills, 1 hours in 2025
1.9 km away
Yorkshire Water
Wheel Lane Csointo Trib Blackburn Brook2 spills, 1 hours in 2025
1.3 km away
Yorkshire Water
Deerlands Avenue 177 Csointo Sheffield Lane Dike1 spills, 1 hours in 2025
1.3 km away
Yorkshire Water
Claywheels Lane Csointo Culv Trib Of River Don0 spills, 0 hours in 2025
42 planned, approved or being built and 8 running (114 MW between them). Those within 5 km are on the map above.
Rooftop solar
Woolley Wood School, Chaucer Road - Solar PanelsApproved, not yet built · 190 kW
Mar 2026 250 m away
Rooftop solar
Fletchers Bakeries, Clay Wheels Lane - Solar ArrayApproved, not yet built · 650 kW
Dec 2022 1.7 km away
Rooftop solar
Fletchers Bakeries Limited, Clay Wheels Lane - Solar PanelsPlanning application in · 600 kW
Aug 2023 1.7 km away
Rooftop solar
Sainsburys Supermarkets - Solar PV ArrayPlanning application in · 350 kW
Aug 2024 1.8 km away
Rooftop solar
Northern General Hospital, Herries Road - Solar PanelsApproved, not yet built · 180 kW
Aug 2024 2.3 km away
Rooftop solar
Welbilt UK, Nether Lane - Solar PanelsApproved, not yet built · 680 kW
Nov 2025 2.4 km away
Rooftop solar
The Big Yellow Self Storage, Penistone Road - Solar PanelsApproved, not yet built · 160 kW
Nov 2022 2.6 km away
Battery storage
Yarra Industrial Estate, Loicher Lane - Battery StorageApproved, not yet built · 20 MW
May 2024 2.9 km away
Rooftop solar
Cowley Way, Smithy Wood - Solar PanelsPlanning application in · 150 kW
Jan 2026 3.5 km away
Battery storage
Upwell Street - Battery Energy StorageApproved, not yet built
Oct 2022 4.2 km away
Road and street works within 1 km
15 permitted works running now or planned, 12 of them major.
Major, planned
Deerlands Avenue, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 200 m away
Major
Deerlands Avenue, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 200 m away
Major, planned
Chaucer Close, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 250 m away
Major
Chaucer Close, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 250 m away
Major, planned
Creswick Greave, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major
Creswick Greave, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major, planned
Yew Lane, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away
Major
Yew Lane, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away
Major, planned
Coppin Square, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away
Major
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Parson Cross: +48% over five years (2020 → 2025).
Council tax list: 80 homes added in the neighbourhood since April 2024.
Population (GP registrations): +3.0% in two years.