Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
519hours of spills in 2025 between them (typical neighbourhood: about 36)
70spill events counted
Yorkshire Water
Stockley Wwtwinto River Doe Lea45 spills, 449 hours in 2025
1.7 km away
Yorkshire Water
Carr Vale No 2 Spsinto River Doe Lea25 spills, 71 hours in 2025
2.0 km away
Yorkshire Water
Palterton Main Street Csointo Tributary Of River Doe Lea0 spills, 0 hours in 2025
30 planned, approved or being built and 23 running (137 MW between them). Those within 5 km are on the map above.
Solar farm
Mansfield Road, Temple Normanton - Solar FarmApproved, not yet built · 4 MW
May 2024 4.2 km away
Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025 4.4 km away
Rooftop solar
Blachford UK Limited, Park Road - Solar PanelsApproved, not yet built · 310 kW
May 2024 4.6 km away
Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025 4.6 km away
Rooftop solar
Hardwick View Road, Holmewood - Solar PanelsApproved, not yet built · 230 kW
Jul 2023 4.9 km away
Battery storage
Magnavale Limited - Renewable energy plantApproved, not yet built · 150 kW
Aug 2021 5.1 km away
Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023 5.2 km away
Rooftop solar
Xtratherm UKApproved, not yet built · 2 MW
May 2020 5.4 km away
Solar farm
Frithwood Farm, Frithwood Lane - Solar FarmApproved, not yet built · 25 MW
Dec 2023 5.9 km away
Solar farm
Stud Farm, Elliotts Butchers Farm Shop - Solar ArrayApproved, not yet built · 350 kW
Apr 2024 6.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 19.0 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bolsover South & Glapwell: +28% over five years (2020 → 2025).
Council tax list: 140 homes added in the neighbourhood since April 2024.
Population (GP registrations): +4.0% in two years.