Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
847hours of spills in 2025 between them (typical neighbourhood: about 36)
157spill events counted
Yorkshire Water
Bolsover Wwtwinto River Doe Lea76 spills, 540 hours in 2025
1.3 km away
Yorkshire Water
Bolsover Wwtwinto River Doe Lea45 spills, 228 hours in 2025
1.3 km away
Yorkshire Water
Carr Vale No 2 Spsinto River Doe Lea25 spills, 71 hours in 2025
1.6 km away
Yorkshire Water
Station Road Bolsover Csointo Tributary Of The River Doe Lea6 spills, 7 hours in 2025
200 m away
Yorkshire Water
Iron Cliffe Road Csointo Trib Of River Doe Lea5 spills, 2 hours in 2025
28 planned, approved or being built and 21 running (129 MW between them). Those within 5 km are on the map above.
Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025 2.2 km away
Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025 2.5 km away
Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023 3.0 km away
Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025 3.5 km away
Solar farm
Stud Farm, Elliotts Butchers Farm Shop - Solar ArrayApproved, not yet built · 350 kW
Apr 2024 4.9 km away
Solar farm
Mansfield Road, Temple Normanton - Solar FarmApproved, not yet built · 4 MW
May 2024 5.1 km away
Solar farm
Frithwood Farm, Frithwood Lane - Solar FarmApproved, not yet built · 25 MW
Dec 2023 5.2 km away
Rooftop solar
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026 5.2 km away
Battery storage
Lodge Farm, Calow - Battery Energy Storage SystemApproved, not yet built · 25 MW
Jul 2025 5.3 km away
Rooftop solar
Lindrick Way, Barlborough - Solar PanelsApproved, not yet built · 1 MW
Feb 20245.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major
Woodhouse Lane, BolsoverUtility asset works · BT · Road closure
Oct 2026 to Oct 2026 950 m away
Standard
Chesterfield Road, BolsoverOptional permit (no fee) e.g. for traffic management etc · DERBYSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 800 m away
Minor
Oxcroft Lane, BolsoverOptional permit (no fee) e.g. for traffic management etc · DERBYSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 16.4 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bolsover North & Shuttlewood: +39% over five years (2020 → 2025).
Council tax list: 180 homes added in the neighbourhood since April 2024.
Population (GP registrations): +4.3% in two years.