Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
150hours of spills in 2025 between them (typical neighbourhood: about 36)
17 planned, approved or being built and 19 running (120 MW between them). Those within 5 km are on the map above.
Battery storage
Creswell Road, Clowne - Battery StorageApproved, not yet built · 200 kW
Mar 2025 0 m away
Rooftop solar
Lindrick Way, Barlborough - Solar PanelsApproved, not yet built · 1 MW
Feb 2024 1.6 km away
Solar farm
Frithwood Farm, Frithwood Lane - Solar FarmApproved, not yet built · 25 MW
Dec 2023 4.1 km away
Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025 4.8 km away
Battery storage
Westthorpe Fields Road, Killamarsh - Battery StorageApproved, not yet built · 200 kW
Jun 2023 5.6 km away
Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025 6.0 km away
Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025 6.2 km away
Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023 6.3 km away
Battery storage
Hard Lane, Kiveton Park - Battery Energy Storage SystemPlanning application in
Feb 2025 6.4 km away
Solar farm
Steeley Lane, Steetley - Solar Photovoltaic FarmPlanning application in · 19 MW
Nov 2023 6.5 km away
Road and street works within 1 km
5 permitted works running now or planned, 5 of them major.
Major, planned
Creswell Road, ClowneHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Nov 2026 300 m away
Major
Creswell Road, ClowneHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Nov 2026 300 m away
Major
Creswell Road, ClowneHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 350 m away
Major, planned
Barlborough Road, ClowneHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Nov 2026 400 m away
Major
Barlborough Road, ClowneHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Nov 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Clowne & Barlborough: +24% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.2% in two years.
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026 7.8 km away
Energy from waste
Nottinghamshire Recycling Site, Shireoaks Road - Energy Recovery FacilityPlanning application in · 3 MW
May 2024 8.5 km away
Running nearest: Land at Oxcroft Stocking Ground (solar farm, 3.1 km); Oxcroft Solar Farm (battery storage, 3.1 km); Land at Oxcroft Stocking Ground (solar farm, 3.4 km); Land at Bolsover Moor Quarry (solar farm, 4.2 km); Creswell Solar Park (solar farm, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.