What's changing near S43 3TD
Within 2 km, around Inkersall Green & Duckmanton in Chesterfield. Building, planning, schools, transport, prices and crime.
212new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.1%like-for-like prices in Inkersall Green & Duckmanton, 2024 → 2025 (council +3.5%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
20 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
900 m away - New homes
23 new homes completedhouses · Sep 2025 – Oct 2026
planned Oct 2026
950 m away - New homes
7 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.8 km away - New homes
8 new homes completedhouses · Sep 2026
Sept 2026
1.7 km away - New homes
17 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1000 m away - New homes
10 new homes completedhouses · May 2026 – Jul 2026
Jul 2026
900 m away - New homes
13 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
1.7 km away - New homes
11 new homes completedhouses · Dec 2025 – Apr 2026
Apr 2026
1.7 km away - New homes
7 new homes completedhouses · Dec 2025 – Feb 2026
Feb 2026
1.7 km away - New homes
23 new homes completedhouses · Dec 2024 – Nov 2025
Nov 2025
1.8 km away - New homes
16 new homes completedhouses · Nov 2024 – Nov 2025
Nov 2025
1.9 km away - New homes
12 new homes completedhouses · Jan 2025 – Sep 2025
Sept 2025
900 m away
3homes extended 2021–2025, typically adding 26 m²
6since energy certificates began (2008)
1in S43 3TD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
316hours of spills in 2025 between them (typical neighbourhood: about 36)
93spill events counted
- Yorkshire Water
Troughbrook Road No 2 Csointo Trough Brook35 spills, 141 hours in 2025
1000 m away - Yorkshire Water
Brimington Common Westwood Lane Spsinto Trib Of Trough Beck28 spills, 76 hours in 2025
1.9 km away - Yorkshire Water
Works Road Csointo River Rother11 spills, 36 hours in 2025
1.6 km away - Yorkshire Water
Mill Green Csointo River Rother14 spills, 35 hours in 2025
1.3 km away - Yorkshire Water
Station Rd Staveley Csointo Trough Brook Trib Of R.Rother5 spills, 28 hours in 2025
1.9 km away - Yorkshire Water
Chesterfield Road Csointo River Rother0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 16 running (104 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026
400 m away - Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023
2.4 km away - Battery storage
Lodge Farm, Calow - Battery Energy Storage SystemApproved, not yet built · 25 MW
Jul 2025
2.7 km away - Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025
2.9 km away - Solar farm
Stud Farm, Elliotts Butchers Farm Shop - Solar ArrayApproved, not yet built · 350 kW
Apr 2024
2.9 km away - Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025
3.0 km away - Rooftop solar
Sainsburys, Rother Way - Solar PanelsApproved, not yet built · 350 kW
Feb 2024
3.2 km away - Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
3.2 km away - Solar farm
Old Whittington Wastewater Treatment Works, Station Lane - Solar ArrayApproved, not yet built · 250 kW
Jul 2023
3.4 km away - Rooftop solar
Arnold Clark Motorstore, Meltham Lane - Solar PanelsApproved, not yet built · 190 kW
Apr 20253.6 km away
Road and street works within 1 km
5 permitted works running now or planned, 3 of them major.
- Major, planned
Bevan Drive, InkersallUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026
300 m away - Major
Bevan Drive, InkersallUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026
300 m away - Major
Hillman Drive, InkersallHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
500 m away - Standard
Summerskill Green, InkersallHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Dec 2026 to Dec 2026
250 m away - Standard
Dade Avenue, InkersallHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Dec 2026 to Dec 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
14.9 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
25.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Staveley Power (landfill gas, 1.9 km); Arkwright Solar Farm (solar farm, 1.9 km); Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage (solar farm, 2.2 km); Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage (battery storage, 2.2 km); The Breck (solar farm, 2.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.