Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
300hours of spills in 2025 between them (typical neighbourhood: about 36)
89spill events counted
Yorkshire Water
Troughbrook Road No 2 Csointo Trough Brook35 spills, 141 hours in 2025
2.0 km away
Yorkshire Water
Calow Oaks Farm Csointo Trib Of Calow Brook26 spills, 83 hours in 2025
1.8 km away
Yorkshire Water
Brimington Common Westwood Lane Spsinto Trib Of Trough Beck28 spills, 76 hours in 2025
30 planned, approved or being built and 16 running (104 MW between them). Those within 5 km are on the map above.
Rooftop solar
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026 750 m away
Battery storage
Lodge Farm, Calow - Battery Energy Storage SystemApproved, not yet built · 25 MW
Jul 2025 1.6 km away
Solar farm
Stud Farm, Elliotts Butchers Farm Shop - Solar ArrayApproved, not yet built · 350 kW
Apr 2024 1.9 km away
Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023 2.4 km away
Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025 2.9 km away
Rooftop solar
Sainsburys, Rother Way - Solar PanelsApproved, not yet built · 350 kW
Feb 2024 2.9 km away
Rooftop solar
Arnold Clark Motorstore, Meltham Lane - Solar PanelsApproved, not yet built · 190 kW
Apr 2025 3.1 km away
Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025 3.2 km away
Solar farm
Old Whittington Wastewater Treatment Works, Station Lane - Solar ArrayApproved, not yet built · 250 kW
Jul 2023 3.4 km away
Rooftop solar
Stagecoach Stonegravels Depot, Sheffield Road - Solar PanelsPlanning application in · 230 kW
Road and street works within 1 km
5 permitted works running now or planned, 3 of them major.
Major
Hillman Drive, InkersallHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 650 m away
Major, planned
Bevan Drive, InkersallUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026 900 m away
Major
Bevan Drive, InkersallUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026 900 m away
Standard
Dade Avenue, InkersallHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Dec 2026 to Dec 2026 450 m away
Standard
Summerskill Green, InkersallHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Two-way signals
Dec 2026 to Dec 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 16.0 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 24.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Inkersall Green & Duckmanton: +25% over five years (2020 → 2025).
Council tax list: 60 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.
23 new homes completedhouses · Dec 2024 – Nov 2025
Nov 2025 1.5 km away
New homes
18 new homes completedhouses · Oct 2024 – Nov 2025
Nov 2025 1.5 km away
New homes
13 new homes completedhouses · Oct 2024 – Sep 2025
Sept 2025 1.0 km away
New homes
7 new homes completedhouses · Apr 2025 – Aug 2025
Aug 2025 1.6 km away
New homes
9 new homes completedhouses · Mar 2025 – Jun 2025
Jun 2025 1.1 km away
New homes
14 new homes completedhouses · Oct 2024 – Mar 2025
Mar 2025 1.5 km away
Planning permission
Permission for 9 homes56, TOP ROAD, Calow, CHESTERFIELD, S44 5SY (full planning permission)
May 2023 1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 26 postcodes nearby had new homes completed in the last two years.
Sept 2024 3.4 km away
Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025 3.6 km away
Solar farm
Hasland Photovoltaic Solar ParkApproved, not yet built · 50 MW
Dec 2021 3.7 km away
Running nearest: Arkwright Solar Farm (solar farm, 2.0 km); Land To The East Of Back Lane (solar farm, 2.4 km); Cherry Tree Farm (solar farm, 2.5 km); Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage (solar farm, 2.8 km); Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage (battery storage, 2.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.